1. Digging of all ditches for any purpose, the excavation of all piers,
<br />foundations, holes and trenches, including work incidental to the use of hydro -excavation
<br />equipment; the lagging, sheeting, cribbing, bracing and propping of all foundations; all
<br />work in connection with caissons, cofferdams, including all excavation, drilling,
<br />jackhammering, blasting, shooting, scaling.
<br />2. The loading, unloading, handling and distribution of all materials, fixtures,
<br />furnishings and appliances from point of delivery to point of installation by any means,
<br />hand, machinery, or power rigging.
<br />3. The cleaning and clearing of all debris, including wire brushing of windows,
<br />scraping of floors, removal of surplus material from all fixtures and that of all debris in
<br />building and total construction area; the general clean-up, such as sweeping, cleaning,
<br />wash -down and wiping of construction facilities and furnishings; the loading and removal
<br />of all debris, including crates, boxes and waste material; washing of wall interior and
<br />exterior; partitions, ceilings, blackboards, windows, bathrooms, kitchens, laboratories, and
<br />all fixtures and furnishings therein; the mopping, washing, waxing and polishing and/or
<br />dusting of all floors or areas.
<br />4. The tending of all temporary heat when done by any process; the drying of
<br />plaster, concrete, mortar or other aggregate when done by salamander heat or any other
<br />drying process.
<br />5. The tending of cement masons, brick masons, plasterers, carpenters and other
<br />Building Construction Crafts. Tending shall consist of the preparation of all materials and
<br />the handling and conveying of materials to the point of erection or installation to be used
<br />by mechanics or other Crafts, whether such preparation is by hand or any other process,
<br />including power rigging and incidentals thereto. After the material has been prepared or
<br />unloaded, tending shall consist of the supplying and conveying of said material and other
<br />materials, whether done by hand, shovel, bucket, hod, wheelbarrow or buggy, or other
<br />motorized unit used for such purpose.
<br />The tending of Carpenters shall consist of the conveying of all materials from point
<br />of unloading to the point of installation or erection by any mode or method; the cleaning
<br />of all materials, such as pulling of nails, the cleaning and oiling of all forms; the driving
<br />of all stakes for bracing of forms, tending the saw man by off bearing the materials,
<br />supplying material to the saw and the stacking of the finished product and then transferring
<br />said materials to the point of installation on the project.
<br />6. Scaffold erection, the total erection, building and installation, planking,
<br />bolting, lining, leveling, bracing and the total dismantling of same; the building, planking,
<br />3
<br />
|