My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2-PCA - Main & Colfax Parking Structure Repairs Project No 115-143A - DC Byers Detroit Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Order & Project Completion Affidavits
>
Change Order No 2-PCA - Main & Colfax Parking Structure Repairs Project No 115-143A - DC Byers Detroit Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 11:05:22 AM
Creation date
9/25/2019 2:59:43 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
"k,o! rot <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />143A - <br />Project Number: 115 Project Name: vla"" &Colfax Park°nq Structure Repairs 2019 Change Order #: 2 <br />DATE INITIATED: 8/15/2019 BPW DATE: 8/27/2019 <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Deduct due to work completed consuming less than estimated. <br />Attachments: (List documents support change — required) <br />Amount of ❑ Increase / 8 Decrease: $ 145, 735.00 <br />Categories (Pick One): <br />Previously approved Change Order(s): $ 0 _ ❑ Scope of Work <br />❑ Differing Site Conditions, Changed Conditions <br />Current Percent of Change: (16.8) % ❑ Conflicted Specifications and Drawings <br />...___..............�.w.................. . . . . ..................................... El Failed Materials <br />New Total Amount: $ 720, 635.00 ❑ Error <br />/ ElOmission <br />Total Percent of Change: (16.8) % ❑ Final Quantity Adjustment <br />Funding Secured From: Parking Garage Fund and RWDA <br />.WWWW ..... <br />(filled out by PM) <br />RECOMMENDED BY: <br />Project Inspector (Print Name) (Signature) (Date) <br />REVIEWED BY: <br />Construction Manager (Print Name) (Signature) (Date) <br />APPROVED <br />Engineering Project Manager (Print Name) (Signif (Date) <br />APPROVED BY: � <br />City Engineer (Print Name) (Signature), (D <br />
The URL can be used to link to this page
Your browser does not support the video tag.