Laserfiche WebLink
"k,o! rot <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />143A - <br />Project Number: 115 Project Name: vla"" &Colfax Park°nq Structure Repairs 2019 Change Order #: 2 <br />DATE INITIATED: 8/15/2019 BPW DATE: 8/27/2019 <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Deduct due to work completed consuming less than estimated. <br />Attachments: (List documents support change — required) <br />Amount of ❑ Increase / 8 Decrease: $ 145, 735.00 <br />Categories (Pick One): <br />Previously approved Change Order(s): $ 0 _ ❑ Scope of Work <br />❑ Differing Site Conditions, Changed Conditions <br />Current Percent of Change: (16.8) % ❑ Conflicted Specifications and Drawings <br />...___..............�.w.................. . . . . ..................................... El Failed Materials <br />New Total Amount: $ 720, 635.00 ❑ Error <br />/ ElOmission <br />Total Percent of Change: (16.8) % ❑ Final Quantity Adjustment <br />Funding Secured From: Parking Garage Fund and RWDA <br />.WWWW ..... <br />(filled out by PM) <br />RECOMMENDED BY: <br />Project Inspector (Print Name) (Signature) (Date) <br />REVIEWED BY: <br />Construction Manager (Print Name) (Signature) (Date) <br />APPROVED <br />Engineering Project Manager (Print Name) (Signif (Date) <br />APPROVED BY: � <br />City Engineer (Print Name) (Signature), (D <br />