My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2-PCA - Main & Colfax Parking Structure Repairs Project No 115-143A - DC Byers Detroit Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Order & Project Completion Affidavits
>
Change Order No 2-PCA - Main & Colfax Parking Structure Repairs Project No 115-143A - DC Byers Detroit Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 11:05:22 AM
Creation date
9/25/2019 2:59:43 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MAINTENANCE BOND <br />Bond No. 10162693 <br />KNOW ALL MEN BY THESE PRESENTS: <br />That Byers D.D, Detroit Inc. DBA D.C, Byers Company/Detroit, Inc, , as Principal, hereinafter called <br />Contractor, and The Guarantee Cornpany of North America USA , as Surety, hereinafter called <br />Surety, are held and firmly bound unto City of South Bend as <br />Obligee, hereinafter called Owner, in the penal sum of Seventy Two Thousand Sixty Three <br />Dollars and ($72,063.00 ) Dollars for payment whereof Contractor and Surety bind <br />themselves, their heirs, executors, administrators, successors, and assigns, jointly and <br />severally, firmly by these presents. <br />WHEREAS, Contractor has constructed various public improvements: Main & Colfax Parking <br />Structure Repairs,,Project No. 115-143A in accordance with the <br />General Conditions, the Drawings and Specifications, which Plans are by reference <br />incorporated herein, and made a part hereof, and is referred to as the Plans. <br />NOW, THEREFORE, the condition of this obligation is such that, if Contractor shall <br />remedy any defects due to faulty materials or workmanship, and pay for any damage to <br />other work resulting therefrom, which shall appear within a period of 3 Year(s) from <br />the date of acceptance of the improvements by the Obligee, then this obligation to be <br />void; otherwise to remain in full force and effect. <br />PROVIDED, HOWEVER, that Owner shall give Contractor and Surety notice of <br />observed defects with reasonable promptness. <br />SIGNED and sealed this 10th day of September, 2019 <br />In the presence of BLers D.C. Delrok Inc, VDBA D.C. Byers om an DMrort Brew <br />Principal <br />By: <br />Title <br />OTC's � The Guarantee Company of North America USA <br />Surety <br />00 By; <br />( )NNAME���� Beth Walker , Attorney -in -Fact <br />
The URL can be used to link to this page
Your browser does not support the video tag.