Laserfiche WebLink
Item 11: Topsoil, Underrun <br />• Quantity Adjustment: 15 CYS to 1 CYS <br />• Cost Decrease: $1,035.00 to $69.00 <br />• Net Decrease: ($966.00) <br />Item 12: Nursery Sodding, Overrun <br />• Quantity Adjustment: 70 SYD to 100 SYD <br />• Cost Increase: $1,368.50 to $1,955.00 <br />• Net Increase: $586.50 <br />Item 13: Force Main, 4" Diameter, Underrun <br />• Quantity Adjustment: 50 LFT to 22 LFT <br />• Cost Decrease: $13,316.00 to $5,859.04 <br />• Net Decrease: ($7,456.96) <br />Item 14: Asphalt Pavement Patching, Underrun <br />• Quantity Adjustment: 15 LFT to 9 LFT <br />• Cost Decrease: $6,658.05 to $3,994.83 <br />• Net Decrease: ($2,663.22) <br />Item 23: Debris Removal Allowance: <br />• Quantity Adjustment: 200 Tons to 0 Tons <br />• Cost Decrease: $4,000.00 to $0.00 <br />• Net Decrease: ($4,000.00) <br />Item 24: Utility Relocation Allowance: <br />• Quantity Adjustment: 1 LS to 0 LS <br />• Cost Decrease: $10,000.00 to $0.00 <br />• Net Decrease: ($10,000.00) <br />TOTAL NET DECREASE: ($23,125.23) <br />SUMMARY OF CHANGE ORDER NO. 1 <br />Original Contract Sum: <br />Net Change by Previously Authorized Change Orders: <br />Contract Sum prior to this Change Order: <br />By this Change Order, the Project Amount is Decreased by: <br />The new Contract Sum including this Change Order: <br />This Change Order Represents a Total Change of: <br />Total Change for the Entire Project: <br />$360,577.79 <br />$ 0.00 <br />$360,577.79 <br />($ 23,125.23) <br />$337,452.56 FINAL <br />-6.41 % <br />-6.41 % FINAL <br />Adjustment in time by 140 Days to account for manufacturer's delays in product delivery to <br />the site. Control Cabinet product is a City Standard and adjustment is being made due to <br />City's preference and requirement for the specific product for compatibility. <br />Final Payments shall be issued through the Division of Utilities through the Utilities Wastewater <br />Capital Account 642-0630-415-43-66 . <br />For questions regarding the above recommendation or the subject project, contact Al Greek <br />(Ext. 4210) at the Division of Utilities or Jacob M. Klosinski (Ext. 9496) at the Division of <br />Engineering. <br />