My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - Vested Interest Building Roof Repair Project 119-049 - Midland Engineering Company
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Award Bids
>
Award Bid - Vested Interest Building Roof Repair Project 119-049 - Midland Engineering Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 9:45:06 AM
Creation date
9/25/2019 2:55:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
130ARD 01�'puB1 ic W <br />ORKS <br />C—ITY, OF SOUTH. BEND 1 61A1' A <br />PUBLUC WORKS CONTRACT <br />THIS AGREEMENT, made and entered into this 24th day of September, 2019, by abetween, <br />Midland Engineering Company, Inc., 52369 State Road 933 North, South Bend,nd IN 46637, <br />[JEREINAFTER called the "Contractor", and the Board of Public Works herein called the <br />"Board <br />WITNESSETH: That tile Contractor covenants and agrees to jnake the 1"bilowing improvement, <br />as Fully Set Out in the Notice to Bidders, Standard Specification, Special Provisions, Plans, and Bid <br />proposal, all Of which are set tbrth as a part of this Contract, Jbr: <br />PRQJECT No. - 119-049 <br />5_Lils _" I I-MIt Q N VESTED INTERESTBUILDING ROOF REPAIR <br />QQ_MPLETIONDAT� L �r,, S ,jIqC,jjlONS <br />A N: F. $226,800; BASE BID ONLY <br />F, I N G: <br />Q N �D RWDATIF <br />The total bid for this improvement were those prices as received and accepted by the Board on <br />September 10, 2019. <br />The Contractor further agrees to notify the Engineer when this improvement is completed, This <br />notification shall be in the form of a Completion Affidavit, signed by the Contractor, LJpo,n final <br />acceptance of the improvement by the Engineer, the Contractors final estimate will be presented <br />to the Board for final Payment with one (1) copy Of the Completion Affidavit and one (1) copy of <br />F1 Waiver of Lien, <br />BOARD OF PUBLIC WORKS <br />Gary A. .11lot, President <br />Genevieve E. M_i1_1er,_ <br />Member <br />— e <br />Ti4reej , (,� — _ <br />, k )ra Member <br />MIDLAND EN(JINEERING <br />COMPANY, INC, <br />fl",fibeth A. Mal ember Printed Name <br />arrr L. O'Sullivan, Mern&er <br />Signature <br />M. Mart n, <br />"A est: -Lin <br />Clerk <br />CERTIFICATION (To be completed if Contractor is a Corporation) <br />1, Contractor herein; that..., certify that I am Secretary of the Corporation named as <br />was then who signed this Agreement on behalf of the Contractor <br />of said Corporation; that said agreement was duly signed for and in <br />behalf of said Corporation by authority of its governing body, <br />corporate powers. and is within the scope of its <br />Secretary Corporate Seal <br />
The URL can be used to link to this page
Your browser does not support the video tag.