My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2- Liberty Tower Improvements Division C Project No 118-086R - Environmental Glass Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 2- Liberty Tower Improvements Division C Project No 118-086R - Environmental Glass Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:55:29 PM
Creation date
9/11/2019 10:16:21 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />Project Number: 118-086R Project Name: Liberty Tower Improvements DivC Change Order #: 2 <br />DATE INITIATED 8/5/19 <br />BPW DATE: <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />To Remove Exterior Walls, Temp Walls Needed to be Built. Add Contract Days Due to Glass <br />Supplier. <br />Attachments: (List documents support change - required) <br />Contractors pricing. <br />Amount of lig Increase / B Decrease: , 2219.78 <br />Categories (Pick One): <br />Previously approved Change Order(s): $-4227.32 <br />B Scope of Work <br />........ <br />..... ❑ Differing Site Conditions, Changed Conditions <br />Current Percent of Change .74 % <br />❑ Conflicted Specifications and Drawings <br />.. .,. .- ........... ..... ........... .......... <br />New Total Amount $ 992 46 <br />El Materials <br />_.... ...... <br />❑ Error <br />__ WW <br />66 <br />B Omission <br />Total Percent of Change: __ % <br />❑ Final Quantity Adjustment <br />Funding Secured From: 3ZN- loso.„4„&,Q -u2-ta 0 <br />(filled out by PM) <br />RECOMMENDED BY: <br />Josh Ehmer <br />120119 <br />Project Inspector (Print Name) <br />(Sigra e t3ate) <br />REVIEWED BY: <br />Construction Stan ger (Print Name) <br />(Signature) (Date) <br />APPROVED BY: <br />Engineering Project Manager Name) <br />(Print <br />(Signat (Dad) <br />APPROVED BY.. <br />' �r2111 <br />City Engineer (Print Name) <br />(Signature) (Ddlte)� <br />
The URL can be used to link to this page
Your browser does not support the video tag.