Laserfiche WebLink
�DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />1 1 7-1 OOR lffeyrtrtde BUMing Extewr PenoyraVon (Dwisi`on Ate <br />Project Number: Project Name: Change Order #: 2 <br />DATE INITIATED.8m23-19 BPW DATE:9-10-19 <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Curb wall reinforcement is needed to structurally secure the new skylight. Interior bracing options <br />were suggested, but DCI does not want visual obstructions for the new skylight. An exterior <br />bracing option was planned which involves some reconstruction and roof membrane work. A 66 <br />day extension was included for design delays and new subcontractor scheduling. <br />Attachments: (List documents support change — required) <br />Attached price breakdown <br />........ _- <br />Amount of B Increase / ❑ Decrease $.20, 229.00 <br />Categories (Pick One): <br />Previously approved Change Order(s): $ 3,683.00 ❑ Scope of Work <br />............."" ..... <br />— - 8 Differing Site Conditions, Changed Conditions <br />Current Percent of Change„ 9'30 <br />❑ Conflicted Specifications and Drawings <br />New Total <br />..Amount: $237,812.00 ❑ Failed Materials <br />❑ Error <br />11 18 _ ❑omission <br />Total Percent of Change: -___ % ❑ Final Quantity Adjustment <br />Funding Secured From; 324-\�Q_460 -Z,o2 <br />(filled out by PM) <br />RECOMMENDED BY: <br />Dan Jones 8-�� l f. <br />Project Inspector (Print Name) (Signature) (Date) <br />REVIEWED BY: <br />Toy Villa , �q <br />_. <br />_. <br />Construction Manager (Print Name) (Signature) (Date) <br />APPROVED BY: <br />Kyle Silveus 9' <br />Engineering Project Manager (Print Name) (Signs e) (Date) <br />APPROVED BY: <br />Kara Boyles, f° <br />City Engineer (Print Name) (Sigrttf+re) (Date) <br />