Laserfiche WebLink
PART 1- GENERAL <br />1.01 RELATED DOCUMENTS <br />A. Drawings and general provisions of the contract, including General Conditions and Special <br />Provisions and other Division-1 Specification Sections, apply to this Section. <br />1.02 PROJECT SUMMARY <br />A. The Project includes the furnishing of all equipment, material, insurance, and labor for <br />remodel improvements to 510 S Main Street (former Salvation Army building) <br />Including but not limited to life -safety upgrades, roof repairs and general' <br />cleaning/restoration of existing floor, wail and ceiling finishes; Two Alternates are <br />included for the addition of one of two new Restrooms, all located within South Bend, <br />Indiana. <br />The Project will have a completion date of October 25, 2019. <br />B. The "Work" of this Contract is defined in the Contract Documents to include, but not <br />necessarily to be limited to, the Weather Amnesty — 2019, 510 S. Main Street Building <br />Improvements as indicated on the Plans and as outlined in these Specifications. <br />C. The Contractor's coordination of the Project shall include all portions of the Work indicated <br />by the Contract Documents including coordination of the work of subcontractors. <br />D. The Contractor shall carry out this Project under the Codes and Rules of the State of Indiana <br />and any applicable local ordinances. <br />1.03 FIELD MEASUREMENTS <br />A. Before ordering any materials or commencing with any work, Contractor shall field verify all <br />existing conditions, take measurements, and shall be responsible for the correctness of <br />same. <br />1.04 CONTRACTOR USE OF PREMISES <br />A. During the construction period, the Contractor shall have use of the site for construction <br />operations to the extent possible.. <br />1.05 CONSTRUCTION DOCUMENTS <br />A. The Plans and Specifications are intended to provide the general requirements of the <br />Project, based on the best information at the time of design. The Contractor shall be <br />responsible to provide all additional layout, dimensions, coordination, survey work, labor and <br />materials necessary to provide a complete and operating system. <br />END OF SECTION 01010 <br />WEATHER AMNESTY — 2019 SUMMARY OF WORK 01010 - 1 <br />510 S. MAIN STREET BUILDING IMPROVEMENTS <br />