CONSTRUCTION <br />Selge Construction South Bend GESC 2019 <br />Measurement and Verification <br />Selge will install a revenue grade meter, irradiance meter, weather station, and current transformers to <br />accurately measure the power generated from the solar project. We will then calculate the savings from the <br />agreed upon baseline $/kWh. We will monitor the production from each inverter and combiner box to <br />ensure the system is producing at its fullest capacity. This way we will be able to determine if there have been <br />any blown fuses or solar panel issues. <br />Our baseline for the energy savings will be based off a minimum of the current rate for the electricity <br />delivered to the fire station at the time of the installation. The calculated savings will be energy produced by <br />solar multiplied by the baseline rate. It will not be based off overall reduction in energy consumption from <br />historical data. In the event other energy savings measures are taken or energy consumption increases due to <br />higher occupancy, that will not be taken into consideration for our measurement. <br />We will not guarantee any stipulated savings. <br />Since Selge has not completed a GESC project to date, we are unable to provide a report from a previous <br />project. Nevertheless, we are confident in our solution for measurement and verification considering our <br />history with Power Purchase Agreements and that revenue grade metering with CT's is the standard. <br />Although Selge Construction has not completed a GESC project, we would like nothing better than to <br />partner with the City of South Bend on this project. Over the years, Selge has had a great working <br />relationship with the utilities and engineering departments at South Bend and we are confident in our abilities <br />to develop a great project for the City and the Fire Department. <br />27 <br />