Laserfiche WebLink
Energy Performance Contracting Services AMERESCO,4� <br />Green - Clcan ® SADina hle <br />a. Provide summaries of at least three but no more than five projects completed by this specific <br />branch of your firm, completed between 2012 and 2017. At least two projects should include <br />a solar energy system. Include the following details for each project: <br />CITY OF SOUTH BEND, INDIANA <br />The Century Center Convention Center <br />Type of contract: <br />Guaranteed Savings <br />Project Description: <br />New Solar System on Roof <br />New Roofing System <br />New LED Lighting Interior & Exterior <br />HVAC Improvements with DDC Control Systems <br />Nature of Responsibility: <br />Reducing energy consumption <br />kiz!71" Reducing operating costs <br />Replacing equipment and building components <br />Guaranteeing energy and operating savings <br />Number of Buildings <br />Project Dates <br />Contract Amount <br />Capacity (kW) of solar energy system <br />Contract Term <br />Guaranteed Savings / Actual 11" Year Savings <br />Energy/Water Savings / Actual V Year Savings <br />1 <br />April 2015 to July 2016 <br />$4,926,784 (Solar Component $69,180) <br />23 kW <br />15 years <br />$453,441 $465,335 <br />$84,004 / $95,899 <br />Reference <br />Mr. Scott Herczeg — Director of Operations <br />574-235-9130 <br />Clity of South Bend — August 27, 2019 13 6 Performance Contracting References <br />"Page content is subject to Confidentiality Restrictions" <br />