My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 8 - Howard Park Redevelopment & St Louis Blvd Improvements Project No 117-047B - Larson Danielson
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 8 - Howard Park Redevelopment & St Louis Blvd Improvements Project No 117-047B - Larson Danielson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 1:01:39 PM
Creation date
8/28/2019 10:24:07 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SOUTH BEND PARKS PROGRAM <br />CHANGE ORDER NO. 8 COVER SHEET <br />DATE INITIATED: 8-5-19 REQUIRED APPROVAL DATE: <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />1. Revised Light Fixtures —Owner Directed <br />2. Partition Between MCC Panel & Water Tank - Owner Directed <br />3. Relocate Manhole # 3-Error <br />4. Access Panels per RFI 128 - Error <br />5. Revised Steel for Partitions Support - Error <br />6. Colored Concrete at Crosswalks- Owner Directive <br />7. Delete Lockers and Add Soffit per ASI #23-Owner Directive <br />8. Rework Fireplace Framing per ASI #25- Error <br />9. Engraved limestone Building Stones -Owner Directive <br />10. Radiant Heaters Per ASI #25-Owner Directed <br />11. Cut Column Down & Cap @ Canopy -Error <br />12. Cost of Access Panels Per ASI #26-Error <br />13. Relocate Storm Pipe Field Directive #12- Error <br />14. Change support Bidg OH Door Glass -Owner Directed <br />Increase/(Decrease) from previously approved Change Order(s): <br />$ 156 046.59 <br />Date/Time Added: <br />New Contract Sum with This Change Order: <br />N <br />Percent of Change Order: <br />SUBMITTED/PREPARED BY: <br />Ael <br />Resident Project Representative (Print Name) <br />RECOMMENDED: <br />__� <br />Construction Manag (Print Name) <br />RECOMMENDED: <br />;60Z , � <br />Project Manager (Print Name) <br />REVIEWED-, <br />Project Manager, Venue, Parks and Arts (Print Name) <br />RECOMUNDEDAPPROVAL: <br />_..._ ... <br />Director, Venue, Parks and Arts (Print Name) <br />Categories (Pick. One): <br />Scope of Work <br />Differing Site Conditions, Changed Conditions <br />Conflicted Specifications and Drawings <br />11 <br />Failed Materials <br />EX <br />Errors and Omissions <br />Incentive/Disincentive <br />Final Quantity Adjustment <br />Owner Directed <br />ENDORSEMENTS/APPROVALS <br />7 ................ <br />lnature) (Date) <br />0/gnarure) <br />r?-. <br />(Date) <br />g�i4-�i 9 <br />(Date) <br />KY. <br />(Date) <br />(Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.