Laserfiche WebLink
General description of Replaced controls for two Fluoride and two <br />project <br />Hypochlorite controls panels and integrated them into the plant's SCADA <br />system <br />6. Manufacturers of principal devices for use <br />on this Project (one manufacturer only for <br />each item) <br />a. Chemical Storage <br />Tanks <br />b. Chemical Transfer <br />Pumps <br />c. Chemical Metering <br />Pumps <br />End of Section <br />City of South Bend 00 43 32 <br />Olive Water Treatment Plant -6- <br />Improvements <br />Assmann <br />Finish Thompson <br />Blue -White Chem Pro <br />June 2019 <br />401495 <br />