My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Olive Water Treatment Plant Improvements Project No 118-024 - Bowen Engineering Corporation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Olive Water Treatment Plant Improvements Project No 118-024 - Bowen Engineering Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 10:17:25 AM
Creation date
8/15/2019 9:07:37 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/13/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Address 3300 E. Chaltenham Place <br />Chicago, IL 60649 <br />Contact person's name Gwendolyn Hughes <br />Telephone number 312-747-7115 <br />General description of Approx. $4.3 Million contract to upgrade <br />project 126 Filter PLC Consoles, Instrumentation, and SCADA System <br />6. Manufacturers of principal devices for use <br />on this Project (one manufacturer only for <br />each item) <br />a. Computer hardware <br />b. Control system <br />application software <br />c. Historical application <br />software <br />d. Programmable logic <br />controllers <br />e. Magnetic f/owmeters <br />f. Pressure and <br />differential pressure <br />transmitters <br />g. Ultrasonic level and <br />flow transmitters <br />CHEMICAL FEED <br />NIA Existing to be used <br />RSLogix5000 Studio <br />Existing <br />Rockwell/Allen-Bradley ControlLogix <br />Not Applicable to WME Scope <br />Not Applicable to WME Scope <br />Flowline LU23 and LI23 Local Indicators <br />The Bidder shall submit with its Bid a copy of this Chemical Feed System <br />Integrator Questionnaire completed by Bidder's intended Chemical Feed System <br />Integrator. The completed Questionnaire may be a loose copy attached to the <br />City of South Bend 00 43 32 June 2019 <br />Olive Water Treatment Plant -3- 401495 <br />Improvements <br />
The URL can be used to link to this page
Your browser does not support the video tag.