My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Lafayette Building Drain Replacement Project No 119-042 - Niezgodski Plumbing Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 1 - Lafayette Building Drain Replacement Project No 119-042 - Niezgodski Plumbing Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:47:10 PM
Creation date
8/15/2019 8:22:22 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/13/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />TO: Linda M. Martin, Clerk <br />Board of Public Works <br />FROM: Kyle Silveus <br />SUBJECT: Change Order No. 1 — 119-042 Lafayette Building Drain Replacements <br />DATE: August 8, 2019 <br />The Lafayette building is being renovated to protect and secure the exterior of the building. <br />Work on the building includes masonry, skylight, and roof drain repairs interior to the building. <br />This drain replacement project has encountered an unforeseen condition that was not <br />reasonably foreseen during the design phase and is going beyond 20% of the contract value. <br />The sub floor drains were deteriorated to the extent that the top third of the metal pipe was gone,. <br />There was no way to tie in the replaced roof drains interior to the building without having a good <br />piece of pipe to attach to. The concrete floor needed to be cut and removed to chase the <br />existing deteriorated piping to the east end of the building to find a good section of pipe to tie <br />into. The trench was then backfilled with sand. <br />Change order 1 is the last change order for the project and is an increase of $20,745.60, or a <br />55.88% increase from the original contract value. <br />Please call with your questions,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.