Laserfiche WebLink
PROJECT NAME: <br />PROJECT NUMBER: <br />QUOTES DUE: <br />BASE QUOTE <br />QUOTE/PROPOSAL <br />CITY OF SOUTH BEND � <br />Fire Station Parking Lot Improvements <br />119-059 <br />,July 23, 2019, 9:30am, Local Time <br />Item No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />MOBILIZATION AND DEMOBILIZATION <br />1 <br />LS <br />8,050.00 <br />$8,050.00 <br />2 <br />EROSION CONTROL <br />1 <br />LS <br />250.00 <br />$250.00 <br />3 <br />MILLING, 1.5" <br />487 <br />SY <br />36.00 <br />$17,532.00 <br />4 <br />HMA SURFACE, 9.5 mm, TYPE B <br />41 <br />TON <br />409.00 <br />$16,769.00 <br />5 <br />TACK COAT <br />1 <br />TON <br />1.00 <br />$1.00 <br />6 <br />COMMON EXCAVATION <br />383 <br />CY <br />31.00 <br />$11,873.00 <br />7 <br />BORROW <br />117 <br />CY <br />47.00 <br />$5,499.00 <br />8 <br />COMPACTED AGGREGATE, NO. 53 <br />336 <br />TON <br />40.00 <br />$13,440.00 <br />9 <br />HOT MIX ASPHALT FOR PATCHING <br />530 <br />SY <br />151.00 <br />$80,030.00 <br />10 <br />ADJUST CASTING TO GRADE <br />1 <br />EA <br />1,850.00 <br />$1,850.00 <br />11 <br />CASTING, FURNISH, INSTALL AND ADJUST TO GRADE <br />1 <br />EA <br />2,950.00 <br />$2,950.00 <br />12 LINE, PAINT, SOLID, WHITE, 4 IN 322 LF 5.00 <br />$1,610.00 <br />Total Amount of Base Quote <br />$159,854.00 <br />ALTERNATE NO. 1 <br />Item No. Description <br />1 MILLING, 1.5" <br />2 HMA SURFACE, 9.5 mm, TYPE B <br />3 TACK COAT <br />Bidder(Firm): <br />Address: <br />City/State/Zip <br />Telephone Number: <br />Fax Number. <br />r <br />4111 <br />By: <br />Quantity Unit Unit Price <br />798 SY 18.60 <br />66 TON 259.00 <br />1 TON 1.00 <br />Total Amount of Alternate No. 1 <br />Walsh & Kelly, Inc. <br />24358 SR 23 <br />574-288-4811 <br />0/Y-4u.7-/ 1 1 Y <br />Total Amount <br />$14,842.80 <br />$17,094.00 <br />$1.00 <br />$31,937.80 <br />('Saf"nature) <br />VP of South Bend Area <br />