My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Wayne St and Leighton Plaza Parking Structure Repairs 2019 Project No 119-048 - DC Byers Co Detroit Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Wayne St and Leighton Plaza Parking Structure Repairs 2019 Project No 119-048 - DC Byers Co Detroit Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:42:23 PM
Creation date
7/24/2019 1:49:24 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/23/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Conforms with The American Institute of Architects AIA Document 310 <br />e #If*A <br />CONTRACTOR: SURETY: <br />(Name, legal stolus and address) (Name, legal slalus and 1raUac/pal place ttrh arinaaa) <br />The Guaiantee Company of North America USA <br />Byers D C Daum, Inc If}BA D C Byers Cornp+anyiDwroa, <br />Ivre„ One Towne Square, Suite 1470 <br />5715 Rivard St. Southfield, MI 48076 <br />Detroit, MI 48211 Mailing Address for Notices <br />OWNER: <br />(Name, legal staters mid a(Iress) <br />City of South Bend <br />227 West Jefferson Blvd <br />South Bend, IN 46601 <br />BOND AMOUNT: 5a'/i Five Percent of Aniount Bid <br />This document has Important <br />legal consequences. Consultation <br />with an attorney Is encouraged <br />wlih respect to Its completion or <br />modification. <br />Any singular reference to <br />Contractor, Surety, Owner or <br />other party shall be considered <br />plural where applicable. <br />PROJECT: <br />(Xame, location or address mad l'rgfect number, (%mn} <br />Wayne Street & Leighton Plaza Parking Structures Repairs 2019 - Project No. 119-048 <br />Tile Coalraciorand ,surety arc bonrrd lo the Ownerin The anuoma sot roeall atx)vc, fur tine plylncnt of which The Contractor and Surety bind <br />tgroiraselves, llaair hairs, oxccualors, adminisiraiols, successors and assigns, jointly and severe^illy, as provided hcrcia.''file conditions of this <br />Botrd arc such that it'Ilia Owvncraccepts the bid of tlae Contractor wviflaha Ilic tinic sInciiied ill tine bid docaanrcnis, or within such Ifine f riod <br />as lnay be agreed to by the Oww°ner and Coninictor, grad Iltc t oariraelor eilher(1) clttals ilrio a eotitrract wvith the Owner in accordance with <br />the terms ofstich bid, and gives smh boast or IiNtd's as inrny be specified in the bidding orC"ootrael Vocitnients, With a surety admitted in <br />Ilia jatisclicdoat of the llna¢act and otherwise acceptable to Tile Owvner, for the faithful ficrIbruiance of such C"olnraet and for the Prompt <br />pay+anent of labor and naalenal Nrilished'In lha prosecution thercol', or (2) pays to the Owvarer the difference, not to exceed ilia amount of <br />thus Bond, befwvicen the amount sivcified ill said bid .and srich urger aniount for which the Owner may in good faith contract with another <br />parly to periirmi the wvork covered by said hid, than this obligation shall be null and void, otherwiso to remain in till lorcu and ellccl, Tlic <br />Surety° hcroby wt°aivcs silly notice of un ugrucmcnt Wtvmco the Oww°ater and Gmlruclur to extend the linic in which ilia Owner may accept the <br />hit), Waiver of"arralice by the Surely shall not apply'tir any c"acrrwnm oxeeeding sixty (60) days in ilia: aggregate Beyond the lime tier <br />lreuelrtuuea of Hds :,Fcealied its the hid doctinienls, and the, Owvner and Cunhuclor shall obtain the Surety's consent liar un extension beyond <br />sixty (60) days. <br />If this Bond is issued in connection wvith a subcontractor's bid to n Contractor, the term Contractor in Ibis Bond shall be dccmcd to be <br />Subcontractor and ilia term Owner shall be dccmcd to be Contractor. <br />When this Bond haw been faaroished to coarrply wwith n wtirlunory°ear ollicr legul rcquilenient in the location oflhc I) ojeuk ally provision in <br />this Build eonflieling wvitil said alalulory or Regal rcq uirumcnl shall bo d'cenied dulord herchoni and provisions eonl'unuing to su'ich <br />stahtlory, or oThcr iqui realnirvilluirl shall be ducillo l wogesraToraaTcaN heseirl, When sea lunmshcd, the intent is that this Moat shall ho construed <br />us u slululory hand and nol us u common law bond, <br />Sighed and scaled this 23rd day of July, 2019, <br />Kathy Wolcott <br />S•0054/AS 8/10 <br />D.C. DeXcAl. Inc. DBA D, <br />Inc. <br />r//?� er Davis, General Manager . <br />The fl grantee Com aan of North America US aroarr <br />ftirrrr.q) (Barr!) +- � i <br />Bye: <br />itle)Vaiehe Giuliano Attorney -in -Fact aatnaaw "r" <br />
The URL can be used to link to this page
Your browser does not support the video tag.