My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 7 - Howard Park Redevelopment Project No 117-047B - Larson Danielson Construction Co Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 7 - Howard Park Redevelopment Project No 117-047B - Larson Danielson Construction Co Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 1:00:51 PM
Creation date
7/24/2019 1:27:17 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/23/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SOUTH BEND PARKS PROGRAM <br />CHANGE ORDER NO. 7 COVER SHEET <br />DATE INITIATED: 6-28-19 REQUIRED APPROVAL DATE: <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />1. ASI WWF Gauge Change Hands free Plumbing —Owner Directed <br />2. Power to Fire Pits @ 16 Added outlets- Owner Directed <br />3. Skate bench Moch Up- Owner Directed <br />4. Change Glass to Opti Gray Solarban 70-Owner Directed <br />5. Extend Drain Tile Per RFI 118 Response- Error <br />6. Delete polished Concrete- Owner Directive <br />7. Security System -Owner Directive <br />8. Add Water Lines- Error <br />9. Modify Prefab Canopy -Owner Directive <br />10. Changes Per ASI 12- Error <br />11. Revised Door Frame Per ASI 16 -Owner Directive <br />12. Siding Changes Per ASI 17- Error <br />13. Add Drainage to Folding Glass per ASI #18 -Error <br />14. Fire Department Connection -Error <br />15. Remove Window and Change Wall Siding Per ASI 20- Error <br />16. Remove Caf6 Furnishings- Owner Directive <br />17. Seatwall Expansion Joint w Control Joints — Error <br />18. Added Sprinkler to Community Building Canopies -Error <br />Increase/(Decrease) from previously approved Change Order(s): <br />6391534 <br />Date/Time Added: <br />New Contract Sum with This Change Order: <br />$. _.._..._....... 18 061.35 999 _... ........ __..... <br />Percent of Change Order: <br />SUBMITTED/PREPARED BY: <br />Resident Project Representative (Print Name) <br />RECOMMENDED: <br />Construction Manager (Print Name) <br />RECOMMENDED: <br />Categories (Pick <br />11 Scope of Work <br />F] Differing Site Conditions, Changed Conditions <br />FConflicted Specifications and Drawings <br />11 <br />Failed Materials <br />Errors and Omissions <br />E] <br />Incentive/Disincentive <br />Final Quantity Adjustment <br />11 <br />wirer Directed <br />ENDORSEMENTS/APPROVALS <br />Project Manager (Print Name) <br />REVIEWED: <br />Project Manager, Venue, Parks and Arts (Print Name) <br />RECOM 'ENDED FOR APPROVAL: <br />..................... ......- .......... <br />..._............. .. <br />Director, Venue, Parks and Arts (Print Name) <br />(Si nature) <br />(Signature) <br />4ire���.�.�.�.�����.�_�.�.�������_...�� ...� ......_ .............��...��...... <br />(Signature) <br />(Sig a rr <br />7- 6 -/9 <br />(Date) <br />(Date) <br />2 <br />(Date) <br />(Date) <br />r� <br />(Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.