Change Order No 1 - Water Works North Pumping Station Well Replacement Project No 117-031 - Peerless Midwest Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 1 - Water Works North Pumping Station Well Replacement Project No 117-031 - Peerless Midwest Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:50:51 PM
Creation date
7/24/2019 1:25:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/23/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
io <br />R4�y <br />MIDWESTE <br />June 18, 2019 <br />City of South Bend Dept, of Public Works <br />Division of Engineering <br />227 W. Jefferson Blvd, Suite 1316 <br />South Bend, IN 46601 <br />Attn: Ms. Rebecca Plantz <br />RE: North Well Field 1A Change Order Request <br />Dear Ms, Plantz: <br />In regards to the North Well Field Well 41A Construction, the City has requested the additional amount <br />needed in order to direct the well construction development water to a sanitary sewer located in the <br />center northbound lane of North Michigan Street. The following additional costs would be incurred: <br />1. Supply of 600 linear feet of 8" x 20' aluminum discharge piping and fittings - $1,889.55 per week (3 - 7 <br />days). Estimated at six (6) days - $1,889.55. Each additional day (if needed) - $629.85. <br />2. Supply, setup, and removal of traffic control as shown on enclosed plan — $603.25 for the 1" day, <br />$155.50 for each additional day. Estimated at six (6) days - $1,380.75. <br />3. Supply of 12' wide Road Ramp with 8" flanged connections - $366.60 per week (3 - 7 days). Estimated <br />at six (6) days - $366.60. Each additional day (if needed) - $122.20. <br />4. Delivery, installation, and removal of 12' wide Road Ramp with 8" flanged connections, including sand <br />base and cold patch, disposal of sand base and cold patch at City owned facility - $5,825.82. <br />In total, we would estimate the total additional cost incurred with this change to be $9,462.72. <br />Additionally, with the proposed change in discharge location, we have delayed the start of this project <br />approximately four weeks. We would ask that Milestone #1 and substantial completion be extended four <br />additional weeks It cannot be determined at this time if the final completion date can still be met. <br />Depending on the weather at the end of the project, we may or may not be able to complete site <br />restoration and planting. <br />Please let me know if there are any further questions, or if we can be of any further assistance. <br />Regards, <br />PEERLESS MIDWEST, INC. <br />Frank T. Williams <br />Project Manager <br />55860 Peen xs(A Gigdu triA IfPkvvy., Knhavvalka, HA 4 6!' 4 <br />574 254.9050 p Il-oorio 574.254 ,9650 fax vvw peed svrrroiiriwost.eco nn <br />