My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 6 - Howard Park Redevelopment Proj No 117-047B - Larson Danielson Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 6 - Howard Park Redevelopment Proj No 117-047B - Larson Danielson Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 1:00:36 PM
Creation date
6/25/2019 3:07:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/25/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SOUTH BEND PARKS PROGRAM <br />CHANGE ORDER NO. _6_ COVER SHEET <br />DATE INITIATED: 5-31-19 REQUIRED APPROVAL DATE: <br />Brief Summary of Change Order-, (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Howard Park <br />Item #1 For Astatic purposes anchor bolts where epoxied <br />Item # 2 Brick Pavers Value engineered <br />Item # 3 Removed window from support building value engineered <br />Item # 4 Insulation under radiant floor value engineered <br />Item # 5 Form Recess for lights under bridge to protect the lighting fixtures error <br />Item # 6 Light Fixture Changes per owner <br />Item # 7 Revised Castings per RFI 97 missed structure size and casting size didn't match error <br />Item # 8 24 Gauge steel wall panel material value engineered <br />Item # 9 Reinstate 3 Tier seatwall per owners request <br />Item # 10 Out Cropping Stone Value Engineered <br />Item # 11 Mondo Flooring Room Al 14 <br />Item # 12 Electric lockset Door 129A owners request <br />Item # 13 Added Fiber to DJ Area Tesco Owner request <br />Item # 14 Waterproof Water Tank Ceiling omission in plans <br />Item #15 Piping and Cables for Cameras and Card Access owners request <br />Item # 16 Saint Louis Boulevard 1 Phase time adjustment <br />Attachments: List documents support change, if an <br />Increase/(Decrease) from previously approved Change Order(s): Categories (Pick One): <br />$ 89,509A3 11 Scope of Work <br />Date/Time Added: <br />Differing Site Conditions, Changed Conditions <br />ElConflicted Specifications and Drawings <br />El Failed Materials <br />New Contract Sum with This Change Order: 7 Errors and Omissions <br />$_17,997430.65 LI Incentive/Disincentive <br />Percent of Change Order: Final Quantity Adjustment <br />5 % X Owner Directed <br />ENDORSEMENTS/APPROVALS <br />SUBMITTED/PREPARED BY: <br />ryaDCa h A tie--' <br />Resident Project Representative (Print Name) matter+) (Date) <br />RECOMMENDED: <br />,w <br />Construction Mana er (Print Name) (Si nn a) (Date) <br />RECOMMENDED: <br />Project Manager (Print Name) i to ta I e) <br />REVIEWED: <br />Project Manager, Venue, Parks and Arts (Print Name) (Si nature (Date) <br />RECO MENDED OR APPROVAL: <br />Director, Venue, Parks and Arts (Print Name) (Signature (Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.