My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Erskine Well Variable Frequency Drive Installation Project No 119-032 - Service One Industrial
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
Opening of Quotes - Erskine Well Variable Frequency Drive Installation Project No 119-032 - Service One Industrial
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 2:01:16 PM
Creation date
5/29/2019 11:24:02 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROPOSAL — CG-05212019-02 <br />Brad VanOosterum <br />South Bend Water Works <br />830 N. Michigan St. <br />South Bend, IN 46601 <br />574-235-9236 <br />bvanooster un)LiP�southbendin. ov <br />Erskine VFD Install Proposal <br />—L vm <br />2203 Clay Street <br />Elkhart, In 46517 <br />(574)226-0587 <br />Fax (574) 343-2132 <br />Tuesday, May 21, 2019 <br />Overview <br />Provide Labor and Material to install electrical systems associated with your Erskine VFD Install Project located <br />within your facility. <br />Scope of"'Work. <br />Procure and deliver project material. <br />- Install VFD on the East Wall. <br />Relocate chlorine gas monitoring equipment to above the window. <br />Install wiring between the VFD and existing MCC cabinet. <br />Integrate VFD with PLC and SCADA system providing additional speed control functionality. <br />- Provide and install new fuses, fuse block, speed potentiometer, IN -Line Reactor, and other miscellaneous <br />materials to achieve factory recommended install of the VFD. <br />Note: All work can be completed during a South Bend Water Works and Service One timeline. <br />Terms and Conditions <br />Warranties <br />- Engineering— Service One will guarantee its engineering from defects for a period of one year. <br />- Hardware —Manufacturer's warranties will apply to all equipment covered in this proposal. <br />- Warranty Exclusions — Service One will not replace or warrant damage due to negligence, vandalism or acts of <br />God. <br />Limits of Proposal <br />- This proposal considers work being done during regular working hours with no O/T of any kind. <br />- Delays by others are not considered by this proposal. <br />Terms of Proposal <br />- 100% due upon completion <br />
The URL can be used to link to this page
Your browser does not support the video tag.