My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2 - Century Center Lower Level Restroom Remodel Project No 118-082A - Brown and Brown General Contractors
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 2 - Century Center Lower Level Restroom Remodel Project No 118-082A - Brown and Brown General Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:52:56 PM
Creation date
5/29/2019 10:53:21 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
„y4bW YWd ,,. <br />DEPARTMENT OF PUBLIC WORKS <br />- DIVISION OF ENGINEERING <br />Project Number: 118-082A Project Name: century Center Lower Restroom Remodel Change Order #: 2 <br />DATE INITIATED:5/20/2019 BPS/ DATE: 5/28/2019 <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Additional carpet and floor patching needed because of omission in drawings. Additional faucet <br />due to water main rupture damage. Accompanied by a 22 day extension to order materials. <br />Attachments: (List documents support change - required) <br />Additional invoices memo from Brown & Brown. <br />Amount of ®Increase / ❑Decrease: $ 9, 831.34 <br />Categories (Pick One): <br />Previously approved Change Order(s): $ 3,601 '27 ❑ Scope of Work <br />El Differing Site Conditions, Changed Conditions <br />Current Percent of Change 4'2 % ❑ Conflicted Specifications and Drawings <br />..- .............._.-.................... ....................................... <br />❑ Failed Materials <br />New Total Amount $ 2552,070.61 <br />❑ Error <br />® Omission <br />Total Percent of Change: 5' 7 % ❑ Final Quantity Adjustment <br />Funding Secured From:. -?- <br />(filled out by PM) <br />1-t4 J41waCC <br />RECOMMENDED BY:. <br />t <br />UA 1 <br />Project Inspector (Print Name) (Signature) (Date) <br />REVIEWED BY: <br />...... <br />L. L-A . . . ........... .......... �Sa 6 141 <br />Construction Man ger (Print Name) (Sic natare Date <br />APPROVED BY: <br />Engineering Project Manager (Print Name) g ;a urw (Date) <br />APPROVED BY: j <br />City Engineer (Print Name (SrgiiiC ') (Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.