My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Four Winds Field Water Softener - Hawkins Water Tech Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
Opening of Quotes - Four Winds Field Water Softener - Hawkins Water Tech Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 2:07:19 PM
Creation date
5/15/2019 3:53:16 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/14/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
XIX. SPECIFICATIONS <br />A. Prevailing Specifications: None <br />B. Water Softener Specifications: <br />1. Water softener: <br />a. Basis of design: Hellenbrand H2OOMQC-450 twin tank water softener with two Meters <br />and MAVs or approved equal. Qty-2 30X72 fiberglass tanks and a 30X50 salt tank. <br />b. Any equal suggested must include a memo describing how equal meets or exceeds <br />basis of design specification. <br />c. System must not require a proprietary brand or form of salt and appropriate salt must <br />be generally commercially available. <br />d. Must have smart controller and regeneration will be demand based and not timer <br />based. <br />e. All equipment must have a minimum 3-year warranty that can be serviced by the <br />quoting firm. <br />2. Installation: <br />a. The Contractor will conduct a site visit prior to quoting with the following City employee <br />to understand the full scope of installation: <br />(i) Nick Gaul <br />574-235-5597 <br />ngaulouLthbencjin.. car <br />b. Four Winds Field is an active facility and installation shall be scheduled with facility <br />representatives to ensure there is no interruption or inconvenience to guests or <br />programming. <br />c. Installation will be new and incorporate all new materials. <br />d. All valves will be 2" ball valves and be lead-free brass. <br />e. All piping will be 2" copper except for brine and drain lines. <br />f. Drain line must be run to appropriate drain. <br />g. The Contractor will obtain any necessary permits. <br />h. The Contractor will complete all necessary start up and programming which will include <br />one-time training for representatives as chosen by the City. <br />i. Installation will include a minimum of 1-year labor warranty. <br />j. Installation will include delivery of 1500 lbs. of salt that is recommended for the <br />supplied system and initial filling of system. <br />Version 1/17/2019 Page - 6 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.