My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Hydrant Flow Testing Project No 119-041 - M.E. Simpson Co Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
Opening of Quotes - Hydrant Flow Testing Project No 119-041 - M.E. Simpson Co Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 2:08:20 PM
Creation date
4/24/2019 10:37:29 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/23/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
M.E. Simpson Co., Inc. I Fire Hydrant Flo / ater ain Capacity Testing Program Page 1 <br />SCOPE OF WORK <br />Fire Hydrant Flow/Watermain Capacity Testing Program <br />FieldThe c vice for the Fire Hydrant/ a ai a aci Testing <br />Program is understood <br />M.E. Simpson Co., Inc. will furnish all labor, material, transportation, tools, and equipment necessary to flow <br />test hydrants in the water distribution system selected by the Utility. M.E. Simpson Co., Inc. shall be required <br />to provide such skilled and trained personnel and equipment necessary to complete the work herein <br />specified. There will be a minimum of Two Persons per team working on the Fire Hydrant Flow/Watewrmain <br />Capacity Tgji ro ram at a,ll times. <br />♦ Work in an orderly and safe manner to insure protection of the local residents, Utility employees, and the <br />Field Staff so that no avoidable accidents occur. <br />♦ All Field Staff will have readily observable identification badges worn while in the field. All vehicles used <br />in the field will have company signs attached. <br />The flow testing equipment to be used will be that which was described in the "Equipment to be used" <br />section. <br />♦ M.E. Simpson Co., Inc. Personnel will meet with the Utility to review the project guidelines and answer <br />any questions on procedures. <br />♦ The initial layout of the project will need to involve distribution Utility staff to help identify the flow <br />patterns in the distribution system, flow testing from larger mains into smaller mains, from the water <br />sources (pump stations and water storage structures), out into the system loops and dead ends. <br />♦ Any pressure zones in the distribution system will be identified on the water atlas prior to developing the <br />fire hydrant flow -testing program. This will need to be done with distribution personnel prior to the start <br />of the program. <br />♦ As a part of the Fire Hydrant Flow/Watermain Capacity Testing program, mapping discrepancies found <br />on the current water atlas will be noted and included as a part of the final report so the Utility can make <br />needed corrections. This will be included as a part of the periodic reporting to the Utility, thus enabling <br />the Utility to keep up with mapping corrections. <br />♦ A progression map shall be maintained for each section under study indicating hydrants assessed on the <br />map. This will be especially helpful in quickly determining the work progress of the crews in the field. <br />♦ It may be necessary to conduct parts of the Fire Hydrant Flow/Watermain Capacity Testing during "off <br />hours" such as at night. This may be required in areas of high traffic volume where traffic may affect the <br />ability to conduct safe flow testing, and traffic volume may affect the ability of the Project Team to be <br />able to safely access hydrants on busy streets. The Project Team will give 24-hour advanced notice of <br />intent to flow test hydrants in a particular area that may require after hours work or nighttime work. <br />This is so the Utility can plan for the area to be worked in, give notification to the Police department, as <br />well as other Public Works Divisions as to the activity that will take place. <br />♦ M.E. Simpson Co., Inc. will use large flow testing signs in designated areas to notify areas to be tested <br />and inspected. <br />M.E. Simpson Co., Inc. can provide the Utility an informational letter briefly explaining the fire hydrant <br />flow -testing program to include with the customer's normal water bill. Frequently, special mailings are <br />used for customer notification. If you choose a special mailing, the Village will be responsible for the <br />postage and printing costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.