My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Hydrant Flow Testing Project No 119-041 - M.E. Simpson Co Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
Opening of Quotes - Hydrant Flow Testing Project No 119-041 - M.E. Simpson Co Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 2:08:20 PM
Creation date
4/24/2019 10:37:29 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/23/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
M.E. Simpson Co., Inc. I Fire Hydrant Flo / aterrnain Capacity Testing Program Page 6 <br />M.E. Simpson Co., Inc.'s Safety Programs cover all aspects of the work performed by M.E. Simpson Co., <br />Inc. We take great pride in our safety plan/policy/program and that is evident in our EMR scores over <br />the last five years. The safety of our employees, the utilities employees and that of the general public is <br />our #1 priority. <br />Our Safety Plan/Policy/Program, with all of its parts, is 60 pages in length. In an effort to be more <br />efficient and less wasteful we do not print copies of the safety program for RFPs. There is nothing <br />secretive or proprietary contained within our plan/policy/program and we are happy to share its <br />contents. If you would like a PDF copy of our plan/policy/program please contact Terrence Williams, <br />Operations Manager, at 800.255.1521 and a copy of our program will be sent via email to you. <br />Below is an overview of our plan/policy/program: <br />piety is a major part of any project. M.E. Simpson Co., Inc. always provides a safe work <br />environment for its employees. Our staff is trained in General Industry OSHA rules, <br />Confined Space Entry & Self -Rescue, First Responder First Aid, CPR, and Traffic Control. <br />While in the field on your project, M.E. Simpson Co., Inc. and its employees will follow all of <br />the necessary safety procedures to protect themselves, your staff and the general public. <br />g s mtor f !y .. �5ti� <br />w .. Thai use of a "one 1person" lealk detection team isdangerous and iirnnliniracticall where water rnnai ns run <br />under roadways, it wound be a dangerous 1precedent to aliow a "one peirsorn" teairn to access irnairn lime <br />y" �, w " with head di P rnos n , and at the sarne time <br />valves located in the roadway, atteq] t try„N ten to,1h valve a <br />try to contirr:fl tiraffffiic flow at that 1peirson"s loa.adon 'irn the street„ <br />Therefore M.E. Simpson Co., Inc. adheres to the following: <br />The Project Manager and the Field Manager will be trained in accordance withh OS111A Standard <br />1.910 (General Industry) and be in possession of an OSHA 10 1-iour or 30 Dour Card. <br />Any listening points located in a "confined space" such as pit and vault installations that require <br />entry will be treated in accordance with the safety rules regarding Confined Space Entry, <br />designated by the Utility, The Department of Labor and OSHA. <br />o All personnel are trained and certified in Confined Space Entry & Self -Rescue. <br />We will follow all safety rules regarding First Responder First Aid & CPR, designated by the <br />Utility, The Department of Labor and OSHA. <br />o All personnel are trained and certified in First Responder First Aid & CPR. <br />We will follow all traffic safety rules, designated by the Utility, The Department of Labor, <br />OSHA, and the Illinois Department of Transportation (per MUTCD). <br />o All personnel are trained and certified, by the AMERICAN TRAFFIC SAFETY SERVICES <br />ASSOCIATION (ATSSA) in Traffic Control and Safety. <br />_ <br />Current nt documentations uof �t�;tiy tuWAaupMlmtnrng pa�u°� c��t��Fur �lc�rn can, I-)t� t����t�ulc��� �c�t.. Ol pqtr� f��ur r°anal �a�u <br />_ <br />".............. H yThese�..ertifications are cutFuen an uai� to (latr".... for „ ), Corr "I lar �p� t p�� ratnot !'el, <br />t n9tulnt�.�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.