My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Century Center Upgrades & Renovation Project No 118-104A-R - R Yoder Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
Opening of Quotes - Century Center Upgrades & Renovation Project No 118-104A-R - R Yoder Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 1:50:29 PM
Creation date
4/24/2019 10:36:17 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/23/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
schedules with the various utilities such that they can proceed with their relocation work as <br />efficiently as possible. <br />2. If the odor of natural gas is detected in a work area at any time during the course of work, the <br />Contractor shall immediately notify NIPSCO at 1-800-634-3524. The Contractor shall also <br />immediately notify the residents of adjacent properties. The Contractor shall advise the residents <br />to evacuate their homes immediately if the odor is present within the dwelling. <br />3. Unless an allowance is specified in the bid tab, the restoration of existing building sprinkler systems <br />damaged by the Contractor's operations shall be repaired at no cost to the City and Owner of the <br />system. If an allowance is provided in the bid tab, the City will reimburse the Contractor up to the <br />allowance amount for sprinkler repairs. Restoration of sprinkler systems damaged by the <br />Contractor's operations exceeding the allowance will be considered incidental to the contract. <br />XVI. DESCRIPTION OF WORK <br />A. Prevailing Specifications: None <br />B. Additions <br />1. Work to be performed shall include furnishing all labor, services, materials, insurance and <br />equipment to Complete Work. <br />2. The Base Bid covers Selective Demolition and Renovation to the interior office spaces as <br />indicated on drawings. Including but not limited to spaces on the Lower, First, Second and Third <br />Levels, according to the intent of the Plans and Specifications. <br />3. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and <br />their property from damage caused by the Contractor's operations. <br />XVII. PLANS <br />A. Prevailing Specifications: American Structurepoint Contract Documents <br />B. Additions: <br />1. The plans consist of 9 Sheets. <br />2. The work shall conform to the plans. <br />3. The drawings are schematic in nature. <br />4. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. <br />5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern. <br />Version 4/2/2019 Page - 5 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.