My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reject Bids - Main St Wayne St Garage Improvements Project No 118-096R
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Reject Bids/Quotes/Proposals
>
Reject Bids - Main St Wayne St Garage Improvements Project No 118-096R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 2:49:09 PM
Creation date
4/10/2019 10:55:22 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/9/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID TABULATION <br />Main St/Wayne St Garage Improvements <br />Project No: 118-096R <br />For Bids Due: 2/12/2019 <br />BASE BID <br />Majority Builders, Inc. <br />Item No. <br />Line Item <br />Quantity <br />Unit <br />Unit Price <br />Cost <br />1 <br />Main St./Wayne St. Garage Improvements <br />1 <br />LS <br />$ <br />742,000.00 $ <br />742,000.00 <br />Roofing Substrate/Structural Repair Allowance No. 1 To Cover Required <br />Substrate and/or Structural Repairs Not Outlined in the Drawings and <br />2 <br />Noted Specifications <br />1 <br />LS <br />$ <br />10,000.00 $ <br />10,000.00 <br />BASE BID TOTAL $ <br />752,000.00 <br />Alternates <br />Majority Builders, Inc. <br />Item No. <br />Line Item <br />Quantity <br />Unit <br />Unit Price <br />Cost <br />1 <br />Vestibule Replacement <br />1 <br />LS <br />$ <br />60,400.00 $ <br />60,400.00 <br />2 <br />Paint Vertical Concrete Elements Above Canopy Along Main Street <br />1 <br />LS <br />$ <br />97,800.00 $ <br />97,800.00 <br />Replace Existing Under Canopy Lighting with New Surface Mounted LED <br />3 <br />Downlights <br />1 <br />LS <br />$ <br />11,150.00 $ <br />11,150.00 <br />New Facade Up Lighting to Illuminate the Entirety of the Vertical Columns <br />4 <br />on Bath Main and Wayne Street Facades <br />...._ .... <br />1 <br />LS <br />$ <br />25,000.00 $ <br />25,000.00 <br />Replace Existing Perimeter Parking Level Chain Link Fencing with 11 Cable <br />5 <br />Barrier Cable System <br />............ <br />1 <br />LS <br />$ <br />152,500.00 $ <br />152,500.00 <br />Remove Existing Street Level Storefront Windows That Do Not Occur in a <br />Condition Space. Fill in Openings with Brick to Match Existing Pattern and <br />6 <br />.. <br />Size. New Brick to Receive Painted Finish. <br />...... <br />1 <br />......__._................ W_ <br />LS <br />$ <br />8,400.00 $ <br />8,400.00 <br />Provide Lockable Ground Level Stair Tower Doors Controlled by Keycard <br />7 <br />Locking System <br />1 <br />LS <br />$ <br />21,240.00 $ <br />21,240.00 <br />8 <br />Repair Cracked Conrete Curb Along Parking Garage on Main Street Side <br />1 <br />LS <br />$ <br />$ <br />9 <br />Repair the Existing South East Non -Operating Westinghouse Elevator <br />1 <br />LS <br />$ <br />$ <br />TOTAL $ <br />376,490.00 <br />Majority Builders, Inc. <br />Base Bid T€:tall <br />$ <br />752,000.00 <br />Alternates' Total <br />$ <br />376,490.00 <br />Base <br />Bid + Alternates Total <br />$ <br />1,129,490.00 <br />Addendum No. 1 <br />Y <br />....................... _. .................................................... <br />!Bid Bond <br />Y <br />_._..... _..... .W�W Wu_ <br />WBE/MBE Form <br />Y <br />Non -Collusion Affadavit <br />Y <br />._ ......... <br />Pre -Qualification <br />Y <br />I hereby certify that the above truly and accurately represents quotes received for this project on DATE <br />Kyle Silveus, PE, Assistant City Engineer <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.