Laserfiche WebLink
MICHELS CORPORATION - STATEMENT OF QUALIFICATIONS <br />5.3 Directional Crossings <br />About Michels Directional Crossings <br />Michels Directional Crossings is the industry leader in land and marine horizontal directional <br />drilling (HDD) technology. With more than 80 drilling rigs providing up to 1.2 million pounds of <br />drilling thrust and pulling power, Michels Directional Crossings has established numerous <br />industry records and is capable of crossing spans of more than 15,000 feet with pipe up to 60 <br />inches in diameter. <br />Services include: <br />• Land and marine horizontal directional drilling (HDD) — land -to -water and water -to -water <br />crossings <br />• Performance of cutting -edge pilot -hole intersect technology <br />• Equipment capable of boring virtually any ground condition <br />• Custom fabricated drilling equipment capable of boring virtually any ground condition <br />• Installation of Direct Pipe®, a trenchless process of installing a prefabricated pipeline in <br />one nearly continuous step <br />I' • - "1 101211% <br />��� <br />, <br />� <br />� <br />�s � �� <br />i-SM- <br />qua <br />m <br />Lower Piney Creek <br />HDD and Install 2,236' of <br />Energy Transfer <br />Proprietary <br />2018 <br />HDD <br />20" steel pipeline <br />Co. <br />Susquehanna River <br />Install 3,980' of 42" steel <br />Williams <br />Transcontinental <br />Proprietary <br />2018 <br />HDD Project <br />pipeline <br />Gas <br />New Fortress <br />Energy Jamaica <br />Install 1,400' of 12" steel <br />New Fortress <br />Proprietary <br />2018 <br />HDD <br />pipeline <br />Energy <br />Calumet River Direct <br />Install 1,530' of 36" steel <br />Pipe <br />pipeline underneath <br />Peoples Gas <br />Proprietary <br />2017 <br />Calumet River <br />Germantown I-41/45 <br />Install 5,787' of 24" <br />._m. <br />. ... ........... .._� <br />HDD <br />pipeline under wetland <br />WE Energies <br />Proprietary <br />2017 <br />and interstate highway <br />Big Sioux River <br />Install 6,328' of 30" steel <br />Energy Transfer <br />Proprietary <br />2016 <br />HDD <br />pipeline <br />Co. <br />Primary Contact <br />Vice President Tim McGuire, 920.924.4332, tmc uire michels.us <br />17 <br />