Laserfiche WebLink
l <br />L i ,�"" <br />��t <br />• On the day of excavation, I will be onsite to assist in supervision and take soil samples <br />beneath and around USTs <br />a The gasoline tank will require eight samples for VOCs, lead & scavengers and <br />naphthalenes <br />• The fuel oil UST will have two bottom samples only analyzed for VOCs and PAHs <br />• All samples will be properly packaged and overnight mailed to laboratory the same day <br />• After the lab results are received, a full closure report will be timely submitted to IDEM <br />for closure acceptance <br />• This quotation does not include any soil borings in case any fractional analytes are <br />detected in the soil samples, as is typically required by IDEM <br />e The cost for these closure activities is $5,830.00 <br />Total project price $12,280.00 <br />Thank you for this opportunity to quote this project and should you have any questions or <br />comments, please feel free to contact me at any time. <br />Sincerely, <br />Thomas Lovisa <br />PINJ.RES111"DlINISE � VA(IJ'UNI11R0DCA6 0 IIO'+u0wuUSNRlheJN `'�aEMItlSLS � CONJ1mYEEDSIlnr-4CEENIFRY <br />