My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - Three Twenty at the Cascade Exterior Insulation and Finish System Project No 118-074B-R - Skyline Plastering Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Award Bids
>
Award Bid - Three Twenty at the Cascade Exterior Insulation and Finish System Project No 118-074B-R - Skyline Plastering Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 9:44:40 AM
Creation date
3/27/2019 1:12:41 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BOARD OF PUBLIC WORKS <br />CITY OF SOUTH BEND, INDIANA <br />PUBLIC WORKS CONTRACT <br />THIS AGREEMENT, made and entered into this 26th day of March, 2019, by and between, <br />Skyline Plastering, Inc., 232 Westgate Drive, Carol Stream, IL 60188, HEREINAFTER called the <br />"Contractor", and the Board of Public Works herein called the 'Board". <br />WITNESSETH: That the Contractor covenants and agrees to make the following improvement, <br />as fully set out in the Notice to Bidders, Standard Specification, Special Provisions, Plans, and Bid <br />Proposal, all of which are set forth as a part of this Contract, for: <br />PROJECT NO.: 118-074B - R <br />DESCRIPTION: THREE TWENTY AT THE CASCADE -EXTERIOR <br />INSULATION AND FINISH SYSTEM <br />COMPLETION DATE: SEE SPECIFICATIONS <br />AMOUNT: $561,500; BASE BID PLUS ALTERNATE NO. 3 <br />FUNDING: REDA TIF <br />The total bid for this improvement were those prices as received and accepted by the Board on the <br />March 12, 2019. <br />The Contractor further agrees to notify the Engineer when this improvement is completed. This <br />notification shall be in the form of a Completion Affidavit, signed by the Contractor. Upon final <br />acceptance of the improvement by the Engineer, the Contractors final estimate will be presented <br />to the Board for final Payment with one (1) copy of the Completion Affidavit and one (1) copy of <br />a Waiver of Lien. <br />BOARD OF PUBLIC ORI.S SKYLINE PLASTERING, INC. <br />Gar A. G � lot, President � l *i4eii,�C� yarad�k, Member Printed Name <br />_r-.... �.......... <br />Member <br />O'Sullivan, Member Signature <br />Therese J. Dorau, Member " """Attest: Linda <br />Clerk <br />CERTIFICATION (To be completed if Contractor is a Corporation) <br />I, _ w , certify that I am Secretary of the Corporation named as <br />Contractor herein; that who signed this Agreement on behalf of the Contractor <br />was then,_,,, <br />of said Corporation; that said agreement was duly signed for and in <br />behalf of said Corporation by authority of its governing body, and is within the scope of its <br />corporate powers. <br />Secretary ._ Corporate Seal <br />
The URL can be used to link to this page
Your browser does not support the video tag.