My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 9 - Erskine Clubhouse Renovation Project No 116-108 - Ziolkowski Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 9 - Erskine Clubhouse Renovation Project No 116-108 - Ziolkowski Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 1:04:07 PM
Creation date
3/12/2019 3:52:01 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DATE 1 /24/2019 <br />City Of South Bend Venues, Parks and Arts <br />Erskine Clubhouse Renovation <br />Project No. 116-108 <br />Ziolkowski Project # 17668 <br />RCO # 026 Rev. 1 <br />1.24.2019 <br />DESCRIPTION: <br />Provide labor, material and equipment to remove service sink in closet G11 and install new <br />base mounted mop sink. Also, install a floor sink near the proposed sink in the old boiler room areas. <br />(Floor sink will need to be verified before cutting.) <br />Item <br />Scope of Work <br />itstimated <br />Unit <br />Subcontractor <br />Material <br />'Total <br />Labor <br />Craft <br />Labor <br />Total <br />No. <br />Quantity <br />Quote <br />Unit Price <br />Material <br />Manhours <br />Type <br />Rate <br />Labor <br />C t <br />Cost <br />za Labor <br />0 <br />$0.00 <br />20 <br />Car <br />$55,45 <br />i �IO9 <br />Saw cufflng, Dern;o 9nd Fran2l t_ ....._ <br />0 <br />$0.00 <br />2 <br />Supt. <br />$57,45 <br />0 <br />. <br />$0.00 <br />SO <br />7 <br />Labor <br />$4:146 <br />$00+4 <br />ZCI Material <br />0 <br />$0.00 <br />0 <br />0 <br />$000 <br />; $0, <br />Concrete„ steel studs. 518"' moister board. <br />0 <br />$0.00 <br />0 <br />$0.00 <br />" tl <br />FRP panels one 1 wall will need to be <br />1 <br />$50 00 <br />0 <br />$0.00 <br />'', "" 0 <br />framed out for lumbin fixtures. The other <br />0 <br />$0.00 <br />" : Ct' <br />0 <br />$0.00 <br />" 0 <br />walls will remain as Is ; <br />0 <br />$0.00 <br />0 <br />$0.00 <br />7 <br />0 <br />$0.00- <br />0 <br />0 <br />$0.00 <br />B.J. White <br />_.._ <br />0 <br />_ .......... <br />_...._ $4,618 <br />$0.00 <br />$tl <br />0 <br />_ <br />$0.00 <br />, 0 <br />0 <br />...... <br />$0.00 <br />0;...:....,� <br />- <br />0 <br />$0.00 <br />"""...""... ..." <br />.... <br />$0.00: <br />Misc Tools $3 / hr. <br />0 <br />$3.00 <br />.• <br />: " $ <br />0 <br />$0,00 <br />. <br />.......... <br />m 0 <br />$0.00 <br />, : <br />0 <br />0 <br />$0.00 <br />0 <br />$0 00 <br />°; "'.. so <br />01 <br />som <br />`::--.:" "„" $0' <br />0 <br />$0.00';"" <br />0 <br />$0,00 <br />...... $ ' <br />0 <br />$0.00 <br />-. ""::7 " 0 <br />__ 0 <br />$0.00� <br />,.,; . $0 <br />0 <br />$0.00„ <br />.. .:,. 0 <br />o $0,00 <br />Sol <br />0 $000 <br />u contractor M arkup <br />°,:Labor <br />Markup <br />Subcontract Total 0 <br />Labor Total <br />15% Material Markup <br />" <br />=; " <br />Material Total <br />Payment & Perf Bond <br />TOTAL RCO AMOUNT " <br />
The URL can be used to link to this page
Your browser does not support the video tag.