My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 4 - Fire Station No 9 Project No 116-012 - Ziolkowski Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 4 - Fire Station No 9 Project No 116-012 - Ziolkowski Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:58:47 PM
Creation date
2/26/2019 1:14:37 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ENE, « <br />tow <br />Ziolkowski Construction <br />4050 Ralph Jones Drive <br />South Bend, Indiana 46628 <br />Attn: Jeff Cerney <br />Fire Station #9- PR # 5 <br />ScM.0f Worlc <br />50654 Teall Road <br />Bristol, In 46507 <br />Fax (574) 855-3592 <br />Cell (574) 334-0259 <br />Quote #C10518-5 <br />November 5, 2018 <br />We are pleased to submit our electrical proposal for the electrical work at the above referenced <br />project. Our electrical scope is as follows: <br />• Price includes the following <br />o Delete Power to dishwasher #5 <br />Add In Wall TV Box in East Wall of Dining 108 <br />Price- Adder <br />Not to Exceed <br />Six Hundred Eighty Five and 00/100 dollars $ 685.00 <br />(Sales tax excluded) <br />Terms and Conditions <br />Warranties <br />- Engineering —Elite Electric will guarantee its engineering from defects for a period of one year. <br />- Hardware — Manufacturer's warranties will apply to all equipment covered in this proposal. <br />- Warranty Exclusions — Elite Electric will not replace or warrant damage due to negligence, vandalism or acts <br />of God. <br />Limits ofProposal <br />- Proposal considers the existence of system drawings to indicate current accurate configuration. <br />- This proposal considers work being done during normal working hours. O/T is not covered by this proposal. <br />- Delays by others are not considered by this proposal. <br />- This proposal does not consider the failure of existing hardware devices retained for reuse. <br />- Utility Costs of any sort are excluded from this proposal <br />- Directional Boring of any sort is excluded from our proposal <br />- Cutting, patching, painting is not included in this proposal. <br />- Data, Security, Speakers, Fire Alarm not included in this proposal <br />Elite Electric Pagel of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.