My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B (13)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
08-16-12 Packet
>
6B (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 9:47:19 AM
Creation date
8/13/2012 1:58:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C--� <br />CEG <br />August 3, 2012 <br />KEN HERCEG & ASSOCIATES, INC. <br />ENGINEERS, ARCHITECTS & LAND SURVEYORS <br />Mr. Bill Schalliol, City Planner <br />Community and Economic Development <br />City of South Bend <br />1316 County /City Building <br />227 West Jefferson Blvd. <br />South Bend, IN 46601 <br />Kenneth P. HerM, P.E., L.S. <br />Nitin V. Timble, P.E., LS. <br />Timothy J. Wall, AIA, LEED AP <br />John E. DeLee, P.E. <br />Brian W. W. Thomasen, P.E. <br />RE: ADDITIONAL PROFESSIONAL SERVICES FOR <br />COMMERCE DRIVE EXTENSION/ CITY PROJECT NO. 106 -083 <br />SHERIDAN AVENUE IMPROVEMENTS & DRAINAGE IMPROVEMENTS <br />AT LINCOhNWAY WEST / CITY PROJECT NO. 107 -039 <br />Dear Bill: <br />We were directed in our meeting at the Public Works offices on July 30, 2012 to prepare <br />combined Erosion and Sediment Control plans and obtain a single Rule 5 permit for a <br />phased construction of referenced projects. Further, NIPSCO has requested field stake out <br />of right ,of way for their relocation efforts. We would like to outline below our scope and fees <br />for this effort. <br />A. Obtain One Rule 5 Permit by combining Commerce Drive & Sheridan/LWW projects as <br />Phase 1 and Phase 2 projects <br />1. Prepare a combined Title Sheet with indexes to Phase 1 Commerce Drive <br />And Phase 2 Sheridan Avenue /LWW construction plan. <br />2. Prepare and attach Combined Erosion & Sediment Control Plans for Phase 1 <br />Commerce Drive And Phase 2 Sheridan Avenue /LWW after the new Title sheet. <br />3. Retain existing title sheets without the signatures to demarcate Phase I and II plans. <br />4 Obtain Soil & Water Conservation District's approval. <br />5 Advertise project in newspaper. <br />6 Prepare Rule 5 permit application and submit to IDEM. <br />7 Obtain IDEM's notice of sufficiency. <br />Fee: $4000.00 (inclusive of SWCD review and IDEM application fee) <br />1 of 2 <br />211 W. Washington Street, Suite 2100 P.O. Bout 547 <br />South Bend, Indiana 46601 Niles, Michigan 49120 <br />Phone: (574) 288 -4580 Fax: (674) 288 -0195 Phone: (269) 684 -45W Fax. (574) 288 -0195 <br />
The URL can be used to link to this page
Your browser does not support the video tag.