Laserfiche WebLink
LUTHERAN SCHOOL - SOCCER FIELDS <br />I STATEMENT OF PROBABLE CONSTRUCTION COSTS <br />December 21, 2011 <br />Base Bid <br />iY <br />CONSTRUCTION ENGINEERING 1 LS $ 21000.00 $ 2,000.00 <br />MOBILIZATION AND DEMOBILIZATION <br />1 <br />LS <br />$ 4,900.00 <br />$ 4,900,_ <br />3,050 <br />CYS <br />$ 7.00 <br />$ 21,350.00 <br />COMMON EXCAVATION <br />MOL <br />$ <br />ITOPSOIL <br />920 <br />CYS <br />1� 5 00 <br />S 4.600.00 <br />SYS <br />$ <br />BASIN SEEDING <br />2.50 <br />$ 12,087.50 <br />It I YElw <br />107 <br />TON <br />$' 0 <br />GEOTEXTILE <br />1.50 <br />$ 427.50 <br />73' <br />LPT <br />$ _ -. <br />. - <br />MOD. MANHOLE, TYPE K4 <br />vi'I I <br />2.000 00 <br />$ 8,000.00 <br />PIPE END SECTION, 24, <br />1 <br />EACH <br />$ 500.00 <br />H.x. - <br />$ 5001 <br />CONTINGENCY <br />1 <br />I.S <br />S 5.200.00 <br />$ 5.'�u�w� <br />IF <br />2011 Base Bid TOTAL <br />S 109,975.00 <br />M:\PR0A0761\2664\Phase 1 \civil \eng\[Cost Estimate (Lutheran School) 8 -30 -201 I. Is1COST ESTIMATE <br />r-� <br />