Laserfiche WebLink
LUTHERAN SCHOOL - SOCCER FIELDS <br />STATEMENT OF PROBABLE CONSTRUCTION COSTS <br />December 21, 2011 <br />Base Bid <br />a <br />CONSTRUCTION ENGINEERING <br />1 <br />LS $ <br />2,000.00 <br />$ <br />2,000.00 <br />MOBILIZATION AND DEMOBILIZATION <br />LS <br />$ <br />4;900.06 <br />$� <br />4,900: <br />COMMON EXCAVATION <br />3,050 <br />CYS <br />$ <br />7 Uv <br />S_ <br />1,350.00 <br />TOPSOIL <br />1 <br />CYS <br />S <br />5.00 <br />$ <br />4,600.00 <br />7,245 <br />BASIN SEEDING <br />51.5 <br />< <br />50 <br />$ <br />12,087.50 <br />(',FOTFXTII,F <br />285 <br />l' <br />1.50 <br />$ <br />427.50 <br />LFT <br />$ <br />MOD. MANHOLE, TYPE K4 <br />4 <br />('II <br />—M); 1i) <br />k <br />8,000.00 <br />PIPE END SECTION, 24" <br />1 _ , <br />EACH $ <br />500.00 <br />0; <br />01N I INOI NCY <br />1 <br />LS $ <br />5,200.00 <br />$ <br />5.200.00 <br />,I <br />2011 Base Bid TOTALI <br />S <br />109.9'5.00 <br />M:\PRO.i10761\2664,Phase 1 \cFvil\eng \[C'ost Estimate (Lutheran School) 8- 30- 2011.xls]COSTESTIMATE <br />• <br />