Laserfiche WebLink
SMLARSON <br />DANIELSON <br />Coavoliction ComIX111y; hzc. <br />To Joe Nucciarone <br />ALLIANCE ARCHITECTS <br />929 LINCOLNWAY EAST <br />SUITE 200 <br />SOUTH BEND, IN 46601 <br />Ph: (574)288-2052 Fax: (574)288-2550 <br />E-Mail: jnucciarone@alliarch.com <br />Request for Information <br />RFI #: 14 <br />Date: 11 /13/2018 <br />L-D Job #: 56-445 <br />Project: HOWARD PARK -REDEVELOPMENT <br />CC: Myron Cohaqan (LOCHMUELLER GROUP), Villa; Toy (SOUTH BEND, CITY OF) <br />Subject: Buried Fire Sprinkler Line <br />Drawing: P2.0 and C4.1 <br />Cost Impact: None <br />Spec Section: <br />Schedule Impact None <br />302 Tyler Street <br />LaPorte, IN 46350 <br />Ph : 219-362-2127 <br />Fax: 219-362-2848 <br />Request: Date Required: 11/18/2018 <br />On sheet P 2.0 the fire line for the community building runs on the northside of the building. On the right side of where that line is <br />shown there is a note "FS Main Buried Below slab from support building" Sheets C4,1 of Volume 1 and Sheet 12 of 29 of Volume 3 <br />shows the line coming from a tap of the main line Near the intersection of Jefferson and St. Louis St. Please advise which document <br />is correct. <br />Requested by: Darin Meyer <br />LARSON-DANIELSON CONST. CO INC <br />PJ RFI Form 1 (T) (CR) Page 1 of 1 <br />