Laserfiche WebLink
Ziolkowski Construction <br />4050 Ralph Jones Drive <br />South Bend, Indiana 46628 <br />Attn: Jeff Cerney <br />Fire Station #9- PIZ # 8 <br />i 9_oof Work <br />50654'1"eall Road <br />l3ristol, In 465(Y) <br />Fax (574.) 855-3592 <br />Cell (574) 334-0259 <br />Quote 4C105184. <br />October 18, 2018 <br />We are pleased to submit Our electrical proposal for the electrical work at the above referenced <br />project. Our electrical scope is as follows: <br />Price includes the following <br />• install V`dgid conduit from room where (fie 3" conduits enter the building <br />fi-orn the metro net to the well between doors I and 2 as indicated. <br />• Conduit shall be installed overhead and down the walls at both ends to <br />approx, 5' ofthe floor <br />• f have included a pull string in the conduit <br />• Necessary junction box's to meet code are included in the run so we don't <br />have more than 360 degrees of bend. <br />• Fire Calking as needed will be included <br />• I have estimated closer to 155. We would want to coftfirm once the conduit <br />is installed and we can pass that along to tile Owner so they can order the <br />Proper length wire needed. <br />Price <br />Not to Exceed <br />Two Thousand Seven Hundred Eighly Five and 001100 dollars $2,785.00 <br />(Sales tax occluded) <br />TC T1_11q9gtC itions <br />W"wranfies <br />Engineering — Elite Electric will guarantee its engineering from defects for a period of one year, <br />Hardware —Manufacturer's warranties will apply to all equipment covered in this proposal. <br />Warranty Exclusions — Elite Electric will iriotreplace or warrant damage due to negligence, vandalism or acts <br />of God. <br />Elite Electric Page 1 of 2 <br />