My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Quote - Ziker Sample Street Building Restroom Remodel Project No 117-123A - Premier I Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Award Quotations/Proposals
>
Award Quote - Ziker Sample Street Building Restroom Remodel Project No 117-123A - Premier I Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 10:11:37 AM
Creation date
1/24/2019 8:18:57 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
1/22/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDI'ANAC-ONIRACIOR'S QUOTE FOR PU13LIg WPM <br />, <br />T <br />1865 <br />PROJECT NAME: Ziker Sample Street Building: Restroorn Remodel <br />PROJECT NO. 117-123A <br />QUOTES DUE Janua 8 2019 9:30 a.m. Local Time <br />Date: <br />Address: <br />City/State/Zip: <br />(Must be completed for all quotes. Please type or print) <br />/7/ Firm: A/ <br />Telephone Number: <br />A A 4 ^ <br />Agent of Bidder (if Applicable): u <br />Pursuant to notices given, the unde signed offers to furnish labor and/or material necessary to complete the <br />p project of: public works ro ect Sf, 0 Y i <br />T A, 117-122AA <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The 01!y of South S nd Department of Public Works <br />w I Quote. as shown on the <br />Proposel <br />and dated � � for the sum of (enter the Tote <br />Bnt r Sum of <br />t <br />( Total Quote plus Alternates shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br />By nL <br />r <br />e) <br />(Printed Name of Person Signing) <br />The above quote is accepted this <br />Subject to the following conditions: <br />des A Myeller,� Member <br />t l u, dJ[( V6--r` <br />ACCEPTANCE <br />d day of <br />Suzanna M. Fritzberg, Member <br />T er sp J. D au, Member <br />,testa Linda M. Marti , Cler <br />20 0 <br />Version 10/31/2017 Page - 7 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.