Laserfiche WebLink
Design Phase Items <br />a. ITopographic Field Survey <br />_ .... T�a�i Fee <br />$39,000.00 <br />b, <br />GeotechnicalInvestigation* <br />$19,200.00 <br />C. <br />d. <br />Project Management & LPA/INDOT Coordination <br />Roadway Design and Plans, Including Signing and Pavement Markings <br />$10,000.00 <br />$233,400.00 <br />e. <br />Pavement Design Analysis, Hourly Rate * <br />$16,800.00, <br />f. <br />Preparation of Categorical Exclusion (CE-1) <br />$15,000.00 <br />g. <br />IDEM Rule 5 Erosion Control Permit <br />$3,800.00', <br />h. <br />i. <br />Utility Coordination <br />Storm Sewer Assessment <br />$15,200.0 <br />$6,800.00 <br />j. <br />,Additional Information for the Environmental <br />$8,900.00 <br />k. <br />Traffic Signal Design and Plans at Bendix Drive and Boland Drive <br />$2,400.00 <br />1„ <br />Traffic Signal Modification at Bendix Drive and Sugar Maple Lane/Court <br />$2,400.00 <br />m. <br />Traffic Signal Design and Plans at Bendix Drive and Nimtz Parkway <br />$9,000.00 <br />n. <br />Detail Curb Ramps <br />$4,700.00 <br />o. <br />p. <br />Sco a Deleted <br />Evaluation for Adding Sidewalks Along a Four Lane Bendix Drive <br />$0.06 <br />$8,650.00 <br />q. <br />r. <br />Evaluation for Adding Sidewalks Along a Three Lane Bendix Drive <br />Conceptual Alignment Alternatives for Three Lane Typical Section <br />$9,850.00 <br />$4,500.00 <br />s. <br />Traffic Study <br />$14,000.00 <br />t. <br />Traffic Signal Warrant Analysis (2 @ $1,190), as needed <br />$2,380.00 <br />u. <br />Landscape Design and Plans <br />$12,000.00 <br />V. <br />Abandoned Design and Plans for Stage 2 and 15% of Stage 1 and PFC <br />Plans <br />$36,520.0011 <br />R/W Engineering <br />Last Deed of Record (8 @ $50) <br />$400.00 <br />W. <br />R/W Engineering and Descriptions (10 descriptions @ $950 <br />Temporary Parcels Only) <br />$9,500.00 <br />R/W Staking (7 @ $550) <br />$3, 850.00 <br />APA (7 @ $250) <br />$1,750.00 <br />$15,500.00 <br />Bid Phase Services, Pre -Construction Conference, Construction Phase <br />X. <br />Office Services, HourlyRate* <br />$5,000.00 <br />y. <br />Subsurface Utility Engineering <br />$40,250.06 <br />77 <br />* Items A.2.b., e. and x. will be invoiced on an hourly rate basis, as defined below, and/or as <br />reimbursable/Subconsultant Items. The amounts are estimated only, and the final amount shall <br />not exceed their respective amounts, without prior written approval from the LPA, in <br />accordance with Section VI, paragraph 6 of this Agreement and/or a subsequent approved <br />amendment to the Agreement. If a right of way acquisition Subconsultant is utilized, the <br />CONSULTANT shall receive as payment the actual cost incurred by the CONSULTANT. <br />3 of 5 <br />Supplemental Agreement No. 2 <br />