My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sewer Insurance Program Approved Contractors - Grove Excavating and Bob Frame Plumbing Services Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Sewer Insurance Program Approved Contractors - Grove Excavating and Bob Frame Plumbing Services Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 10:09:52 AM
Creation date
12/21/2018 11:08:53 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/20/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
c. Workmen's Compensation: Statutory State of Indiana Employer's Liability - $ 100,000. <br />d. Auto Liability: Bodily Injury and Property Damage Combined Single limit - $1,000,000. <br />e. City of South Bend shall be named as additional insured on the Certificate. <br />VIIII. A ISUA4 1 3, = <br />A. Prevailing Specifications/MOT Standard Specifications Section: None <br />B. Additions: <br />1, The (,ollfractor shall be responsible for providing all materials necessary Bor the dewatering <br />and protections of existing structures to porforin the work included on this prqject. <br />2. The Contractor shall submit a Dewatering and Protection of Existing Structures Plan to the <br />Owner and Frigincer for review Prior to beginning any work affected by the control of <br />ground Water arldprotection of existing structures, The playa shall hictude drawings, <br />calcutations and descriptions, as necessary, to clearly describe tile nature: of tile methods to <br />be used by the Contractor, The Phui must be preparcd, signed and sealed by a Professional <br />Vngincer registered in the State of jildialla, wilo is experienced iv dewatering (cchniclues <br />and support of structures and hydraulic loadijjgs. '111c plan must be submitted, reviewed <br />011d COITUMMS addressed adequately before the start of conslructioa� 'File responsible <br />Professional Engineer shall supervise and inordtor the installation and operation of the <br />dewatering/protection of existing structures elerlients. The Contractor shall have full <br />responsibility for tile adcotLlacy of the dewatering melho& of the diversiOn/fete"ti011 <br />systems used, and Por Protection of all existing, structures. <br />3. Foundations and all other parts of tile construction site shall be dewatered and kept free of <br />standing water and muddy conditions, as necessary, for the proper execution of tile work. <br />The Contractor shall install, maintain, and operate all cofferdams, sumps, and other <br />temporary diversion and protective works needed to coltitrol ground water and surface <br />water at the site. Since the work will be perfornied in a resideritial/collinercial arc,:, all <br />continuously operating equipment such as pumps and generators must be irtuffied and <br />enclosed in noise dampening structures so as not to cause a nuisance to nearby residences <br />and commercial establishments. <br />4, Control of surface and groundwater shall be continuous during the period of construction <br />so that olarriage to the work shall not occur. Removal of water from the construction site <br />shall be performed so that erosioll and the transporting of sediment and other pollutartts are <br />ininiinized. Wheal tel-RIVIlAry works used fior dewatering are no longer needed, the <br />Contractor shall remove them and return tile area to a coliditiOn similar to t1lat which <br />existed prior to construction. <br />IX. aLVV Ab V LAI <br />A. Prevailing Specifioations/INI)OT Standartl Specifications Section: 2001, 2100, 715 and City <br />Standard Drawings WW-2, WW-3, WW-6, NVW-7 and WW-8. <br />B. Additions: <br />i. "This work shall entail the removal of conflicting portions of existing sanitary laterals and <br />tile reinstatement of said laterals encountered in tile progress Zild prosecution of the work <br />and tile installation of new sanitary sewer pipe and, laterals and connection to tile exi-sting <br />systern. <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.