Laserfiche WebLink
ExhibitE <br />SEWER INSURANCE <br />CONTRACTOR RATE SCHEDULE <br />November 8, 2016 <br />Pre -qualification categoiy., Second opinion <br />CablL Augerhig . ...... $20-0.09 'no—ur--- <br />Pre-qualification category: Excavation <br />Notes: <br />1. Total crew size shall be a maximum of two persons unless otherwise approved by the Sewer <br />Insurance Administrator or representative thereof. <br />2. Equipment costs shall include WeratM for salneµ <br />3. Contractor shall invoice all other inaterial used on an itemized basis. <br />4. No rate adjustments shall be made For overtiniv hours nor fees associated with travel time. <br />5. There will, be no fces associated with 1.1sc ofpick-up trucks and trailers. <br />Trip Charge for Excavator <br />Excavator <br />Trip Charge for Other Equipment <br />Rubber tire backhoe <br />Mini Excavator <br />Air Compressor <br />Combination cleaner Truck <br />Compactor (hand) <br />Dump Truck (20 A <br />F350 Dump Truck or Similar Trailer <br />Laborer <br />Saw Cutting <br />Trench box, 6' x 6 <br />Trench box, 8' x 6' <br />Trench box, 10' x 16' <br />*When needed, steel sheeting included in cost of trench box. <br />Pre -qualification category: Special <br />Job <br />H am <br />S_125,70O <br />Job <br />___�U7%QL <br />Hour <br />,..$L20,.,kQ,_ <br />Hour <br />jQQ j9 <br />Job <br />�$Inox' <br />Hour <br />L%00 - <br />Job <br />_$9Q.AOL <br />"our <br />_$7QO(t__ <br />Hour <br />___$00.00 <br />Ho-ur <br />M_-00 <br />j9b <br />Job <br />OO.Qp,,,_ <br />Job <br />__j4QQ.90 <br />Job <br />Special conditions shall be address by the Sewer Insurance Administrator through City of South Bend <br />emergency coRtractilig Procedures. <br />15 <br />