My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Urban3 LLC - South Bend Cost Study
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Urban3 LLC - South Bend Cost Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:53:08 AM
Creation date
12/21/2018 11:06:16 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/20/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND COST STUDY - PHASE 2 4 <br />This phase of the analysis will be structured in an open-ended and flexible <br />manner, so the team may incorporate different and additional metrics if needed. <br />This task includes time for fine-tuning the analyses to use more suitable criteria <br />or metrics specific to South Bend. <br />D. Model Construction/Revision <br />After all prior tasks are completed within this phase, Urbana will create the <br />underlying data model and present it to City staff, receive feedback and make any <br />necessary revisions. <br />Task 3 L)eh'verables.• Il::1owerPoint (Draft Report. on analysis findings„ US Ynodel titles <br />Task 4: Property Tax Distortion <br />South Bend's fiscal footprint is particularly relevant given the limitations imposed by the <br />Circuit Breaker state law. Urban3 will include materials to explain how this policy <br />constrains property tax revenue, and show the level of South Bend's ability to cover <br />municipal infrastructure costs due to revenue distortions created by the Circuit Breaker <br />law. <br />South Bend City Staff time: 1 day <br />7 sk 4 Delivei-able: None <br />Task 5: Assembling South Bend's Economic Story <br />A. Graphics <br />Once Urban3 arrives at the final cost calculations from the preceding stages, we <br />will collaborate with the City of South Bend staff to create a set of graphics and <br />visualizations to explain the findings to a general audience, including council and <br />citizens. Urban3 will use these visualizations to synthesize the information into a <br />set of conclusions. <br />Task 5 Defiverable„ (None <br />
The URL can be used to link to this page
Your browser does not support the video tag.