My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - WWTP Admin Building Masonry Improvements Project No 118-087 - Ziolkowski Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Award Bids
>
Award Bid - WWTP Admin Building Masonry Improvements Project No 118-087 - Ziolkowski Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 11:57:32 AM
Creation date
12/21/2018 10:40:16 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/20/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID/PROPOSAL�aG��� . <br />CITY OF SOUTH BEND <br />Project Name: WWTP ADMINISTRATION BUILDING MASONRY IMPROVEMENTS g <br />Project Number: 118-087 <br />For Bids Due: DECEMBER 11, 2018 <br />Contractor Name: Ziolkowski Construction, Inc. <br />BASE BID DIVISION A: ADMINISTRATIVE BUILDING #15 <br />Item <br />No. <br />Description Quantity Unit <br />w_ <br />Unit Price <br />Total Amount <br />1 <br />Exterior and Interior Renovations to 1 LS <br />332,270 <br />332,270 <br />Administrative Building #15 <br />2 <br />Provide an allowance of $16,000.00 for 1 LS <br />$16,000.00 <br />$16,000.00 <br />a construction contingency. <br />Provide an allowance of $3.00 per <br />3 <br />square foot, for material and installation 460 SF <br />$3.00 <br />$1,380.00 <br />of 12"x12" vinyl composition the <br />Provide an allowance of $30.00 per <br />4 <br />square yard, for material and installation 440 SY <br />$30.00 <br />$13,200.00 <br />for 24"x24" commercial rade car et tile. <br />BASE BID DIVISION A: ADMINISTRATIVE BUILDING #15 TOTAL <br />362,850 <br />DIVISION A: ADMINISTRATIVE BUILDING #15 ALTERNATE #A1 <br />Item <br />No. <br />........ <br />Description Quantity Unit <br />Unit Price <br />Total Amount <br />Replace 100% of existing suspended <br />acoustical ceiling tile in rooms listed on <br />1 <br />Room Finish Schedule with new tile 1 LS <br />7,900 <br />7,900 <br />panels per Sheet A5.1. (Base Bid to <br />include replacement of 25% of ceiling <br />the anels. <br />DIVISION A: ADMINISTRATIVE BUILDING #15 ALTERNATE #A1 TOTAL <br />7.900 <br />DIVISION A: ADMINISTRATIVE BUILDING #15 ALTERNATE #A2 <br />............................................................................. <br />Item <br />..__ ... _� <br />No. <br />Description Quantity Unit <br />Unit Price <br />Total Amount <br />Replace 100% of existing window blinds <br />1 <br />with new vertical blinds as listed on 1 LS <br />9,500 <br />9,500 <br />Window Blind Schedule on Sheet A5.1 <br />DIVISION A: ADMINISTRATIVE BUILDING #15 ALTERNATE #A2 TOTAL <br />9500 <br />DIVISION A: ADMINISTRATIVE BUILDING #15 ALTERNATE #A3 <br />Item <br />No. <br />_........... <br />Description Quantity Unit <br />Unit Price <br />Total Amount <br />Provide one coat primer and two coats <br />paint in rooms listed on Room Finish <br />12,500 <br />12,500 <br />1 <br />Schedule, at all remaining interior walls, 1 LS <br />per Sheet A5.1 (Base bid to include <br />interior side of exterior walls , <br />DIVISION A: ADMINISTRATIVE BUILDING #15 ALTERNATE #A3 TOTAL <br />1_?,500 <br />Version 7/20/2018 Contractor's Bid for Public Works - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.