Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Three Twenty at the Cascade — Site Utilities <br />Project Number: 118-074 D <br />For Bids Due: December 11, 201810 A <br />Contractor Name: �4 / Z" <br />DIVISION C — SITE STORM SEWER <br />Item <br />No. <br />Description <br />Quanti <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />24" perforated HDPE pipe w/ all <br />fittings installed , <br />58 <br />LF <br />$ %, oo <br />$ 61)7ol6.0 <br />2 <br />12" SDR-26 PVC pipe w/ all <br />installed complete <br />15 <br />LF <br />$ %3� p�j <br />$ i ?SDIfittings 03 <br />3 <br />12" HDPE-SL pipe w/ all fittings <br />32 <br />LF <br />$ <br />$ 74j'ab <br />installed complete <br />�� <br />4 <br />8" PVC pipe w/ all fittings installed <br />10 <br />LF <br />$ %'va <br />$ 700•� <br />complete <br />5 <br />6" PVC pipe w/ all fittings installed <br />37 <br />LF <br />$.� <br />$ i oZ �; Q© <br />complete <br />6 <br />Storm Water Structures per Plans: <br />a. Drywell DW-1 installed per <br />Schedule complete <br />1 <br />Ea. <br />$ `a �D <br />$ a aj, f <br />b. Drywell DW-2 installed per <br />1 <br />Ea. <br />$ a•go0.4� <br />$ ai, Sao <br />Schedule complete <br />c. Drywell DW-3 installed per <br />1 <br />Ea. <br />$ y6a," <br />$ ew, N <br />Schedule complete <br />, <br />, <br />d. Drywell DW-4 installed per <br />Schedule complete <br />1 <br />Ea. <br />$ d, d'oa, <br />$ a, �'E, Qb <br />e. Drywell DW-5 installed per <br />1 <br />Ea. <br />$ RV <br />' <br />$ 6 SbO 4�7 <br />Schedule complete <br />i <br />f. Drywell DW-6 installed per <br />1 <br />Ea. <br />$ir.UO <br />$ o��C�,� <br />Schedulecomplete <br />g. Catch Basin CB-8 installed per <br />1 <br />Ea. <br />$ cR !o p <br />$ o� ��� Ob <br />Schedule complete <br />,� <br />h. Catch Basin CB-10 installed <br />1 <br />Ea. <br />$ c` 1 �p®,� <br />$ o�� /00 <br />per Schedule complete <br />.... <br />, <br />j. Manhole MH-8A installed per <br />1 <br />Ea <br />$ a, ciCb f1B <br />$ a, o"t Or� <br />Schedule complete <br />14' wide French drain system w/ <br />7 <br />fabric and stone per details <br />1 <br />Ea. <br />$ A iSbD.Q, <br />$ a6 i 8(X.,Od <br />com fete <br />8 <br />Maintenance of Traffic for Site <br />1 <br />Ea. <br />$ �, <br />$, jo <br />Storm Sewer work <br />Sawcut and remove (20) SY+/- <br />9 <br />asphalt pavement for Storm <br />20 <br />Tons <br />$ <br />Sewer Catch Basin work at Gintz <br />Dr. <br />Version`7/20/2018 Contractor's Bid for Public Works - 10 <br />