Project Name:
<br />Project Number:
<br />For Bids Due:
<br />BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Small Drainage Design and Repair
<br />118-063
<br />December 11, 2018 before 9:30 AM Local Time
<br />Contractor Name: G.E. Marshall, Inc.
<br />DIVISION
<br />C, CREEKWATER
<br />Item...
<br />. ......... .........
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />No.
<br />_....1......
<br />_
<br />Maintenance of Traffic
<br />1
<br />LS
<br />$2,500.00
<br />$2,500.00
<br />2
<br />Mobilization and Demobilization
<br />1
<br />LS
<br />$14, 683.25
<br />$14,683.25
<br />Pavement Removal
<br />_. _
<br />62
<br />SYS
<br />$ 32.46
<br />.........
<br />$ 2 , 012.52
<br />4
<br />�........ __
<br />HMA, Surface, 1.5 inches
<br />5
<br />T
<br />$1,00$..0-15,140,00
<br />'
<br />5
<br />HMA, Base, 6.5 inches
<br />22
<br />T
<br />$465.82
<br />$10,248.04
<br />6
<br />Remove/Replace Curb and Gutter, Roll
<br />36
<br />LFT
<br />$112.55
<br />$4,051.80
<br />Curb
<br />7
<br />Core, Connect6on for 12"° Dia. Fbulu: to
<br />1
<br />EA
<br />E,46fingStFUGtUre..
<br />$830.00 _
<br />830.00
<br />_
<br />gtt1i
<br />_�...
<br />Pipe, 12 RCP
<br />LFT
<br />1 43
<br />$ 92 �.._........
<br />$9,621.50
<br />11
<br />1 112" Ductile lrcu
<br />28
<br />t.F,r.
<br />121,1.
<br />10
<br />Mant:oie, Standard
<br />1I
<br />P
<br />$ 6 , 419.35
<br />$ 6 , 419.35
<br />11
<br />Dr well, 6' Dia , 3 sections
<br />..
<br />2
<br />EA
<br />$12, 566.75
<br />$25 ,133.50
<br />..
<br />12
<br />Reset Si nand Post
<br />1
<br />EA
<br />1$200.00
<br />$200.00
<br />13
<br />Utilit Allowance
<br />1
<br />LS
<br />$109,000.00
<br />$100,000.00
<br />CREEK WATER
<br />DIVISION
<br />C TOTAL
<br />$94,133.00
<br />ALTERNATE
<br />#C1 (STREET MILL/FILL & CURB
<br />RAMPS)
<br />Item
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />No.
<br />14
<br />Mobilization and Demobilization
<br />1
<br />LS
<br />$5,664.66
<br />$5,664.66
<br />..............
<br />15
<br />Remove/Replace Curb and Gutter, Roll
<br />14
<br />LFT
<br />$120.85
<br />$1, 691.90
<br />Curb, Depressed ssed _
<br />16
<br />Remove/Replace Concrete Sidewalk &
<br />22
<br />SYS
<br />$206.06
<br />$4,533.32
<br />Curb Ram
<br />17
<br />Milling, Asphalt, 1.5 to 2.5 inches
<br />268
<br />SYS
<br />$27.59
<br />$7,394.12
<br />_
<br />18
<br />. ............
<br />_. ....
<br />HMA, Surface, 1...
<br />5 to 2.5 inches
<br />380
<br />T
<br />$228.00
<br />$6,840.00
<br />19
<br />Utility Allowance
<br />1
<br />LS
<br />$65,000.00
<br />$65,000.00
<br />ALTERNATE
<br />#C1 TOTAL
<br />$32,124.00
<br />Version 7/20/2018 Contractor's Bid for Public Works -10
<br />
|