Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: McKinley Avenue and Fremont Park Improvements <br />Project Number: <br />For Bids Due: <br />118-072 <br />December 11, 2018 <br />Contractor Name: RIETH RILEY CONSTRUCTION, CO., INC. <br />10 <br />. — — - _� . �__�_ <br />Dryrell, 8' Diameter 3600 Gallon <br />�_�m__�..............�...�..........._......................._. <br />2 <br />EA <br />11,755.00 <br />23,510.00 <br />11 <br />Storm Sewer Pipe, 8 IN <br />0 <br />LFT <br />0.00 <br />0.00 <br />.......�....._.12...Storm <br />................� <br />Pipe,LFT <br />Sewer 12 Perforated, .....IN <br />......... ........_.... <br />�� <br />..............................._....................................__.......... <br />95.00 <br />950.00 <br />13 <br />Compacted Aggregate, No. 53 <br />0 <br />TON <br />0.00 <br />0.00 <br />14 <br />HMA Surface, Type B <br />10 <br />TON <br />345.00 <br />3,450.00 <br />........................ <br />15 <br />............ ......................... ................................................. ....... <br />Standard Curb, Concrete <br />360 <br />...... <br />LFT <br />�ww <br />26.50 <br />9,540.00 <br />................_._._ <br />16 <br />._.�.._._..�_ �____................... ...... .. <br />Sign Post, Square Type 2, Unreinforced <br />...................... ....._ <br />9 <br />m..........._............_........_...... <br />LFT <br />.. <br />140.00 <br />1,260.00 <br />�... .._. <br />AnchormBase............................................... <br />.... ........... ....... .................... <br />...................._ .... <br />17 <br />Hydro -mulch Seeding, Mix <br />160 <br />SYS <br />18.50 <br />2,960.00 <br />18 <br />HMA Patching, Type B, Undistributed <br />10 <br />TON <br />mm <br />98:so 6 ................ <br />6,985.00 <br />ALTERNATE <br />131 <br />- TOTAL <br />73 843.50 <br />ALTERNATE <br />B2 — FREMONT PARK IMPROVEMENTS <br />— FULL LANE MILLING <br />Total <br />Item No. <br />Description <br />........................ ..........._............ ............................ <br />Quantity Unit <br />. <br />Unit Price <br />Amount <br />1 <br />Surface Milling, Asphalt, 1 1/2IN <br />1600 SYS <br />10.50 <br />16,800.00 <br />2 <br />HMA Surface, Type B <br />130 TON <br />145.50 <br />18,915.00 <br />ALTERNATE <br />B2 - TOTAL <br />35 715.00 <br />ALTERNATE B3 — FREMONT PARK IMPROVEMENTS —SIDEWALKS, CURB RAMPS ANDCROSSWALKS <br />Item No. <br />Description <br />... <br />Quantity <br />Unit <br />Unit Price <br />Total <br />Amount <br />1 <br />Excavation, Common <br />40 <br />CYS <br />249.00 <br />9,960.00 <br />2 <br />Tree, Remove <br />2 <br />EA <br />1,050.00 <br />2,100.00 <br />3 <br />Sidewalk Concrete, 4IN <br />590 <br />SYS _....... <br />50.00 <br />29,500.00 <br />4 <br />Curb Ramp, Concrete <br />28 <br />SYS <br />307.00 <br />_ 8,596. 00 <br />5 <br />Modified Combination Curb, Concrete <br />17 <br />LFT <br />51.50 <br />. ................... <br />875.50 <br />6 <br />......... ............ ..... ......................................._...._.................... ............ <br />Thermoplastic Crosswalk, Solid, White, <br />.......................... <br />180 <br />LFT <br />10.00 <br />1,800.00 <br />6IN <br />7 <br />Hydro -mulch Seeding, Mix <br />1060 <br />SYS <br />15.00 <br />15,900.00 <br />ALTERNATE B3 —TOTAL 68 731.50 <br />Version 7/20/2018 Contractor's Bid for Public Works - 9 <br />