Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: McKinley Avenue and Fremont Park Improvements <br />Project Number: <br />For Bids Due: <br />118-072 <br />December 11, 2018 <br />Contractor Name: RIETH RILEY CONSTRUCTION, CO., INC. <br />DIVISION A — <br />_ <br />MCKINLEY AVENUE IMPROVEMENTS <br />.Description _...___.__......._ <br />�..�y......__._..__... <br />Item No. <br />Quantit <br />Unit <br />_ <br />Unit Price Total <br />Amount <br />1 <br />Maintaining Traffic <br />1 <br />LS <br />L <br />8,277.00 8,277.00 <br />2 <br />.._....__.....�.�.�....�.�.�.�.�..... <br />Mobilization and Demobilization <br />1 <br />........ ........ ...�.�.�.�. <br />LS <br />_.... <br />6,000.00 6,000.00 <br />3 <br />Clearing of Right of Way <br />1 <br />LS <br />8,157.00 8,157.00 <br />4 <br />Excavation, Common <br />90 <br />CYS <br />125.00 11,250.00 ... <br />...................... <br />5 <br />_................................_ <br />Surface Milling, Asphalt, 1 1/2IN <br />..................... <br />90 <br />............... <br />SYS <br />ww <br />50.50 4,545.00 <br />6 <br />Pavement, Remove <br />5 <br />SYS <br />617.50 3,087.50 <br />7 <br />Temporary Erosion Control <br />1 <br />LS <br />2,321.00 2,321.00 <br />8 <br />Temporary Inlet Protection <br />4 <br />EA <br />253.00 1,012.00 <br />9 <br />Doghouse Manhole, Type <br />2 <br />EA <br />___..�_.....�._. <br />6,018.50 12,037 00 <br />10 <br />Catch Basin <br />1 <br />EA <br />_ .................._....... ............___.........- <br />3,872.50 3,872.50 <br />_......................................... <br />11 <br />. ....................................... <br />Storm Sewer Pipe, 12 IN <br />20 <br />LFT <br />95.001,900.00.�.�.�.�.�.�.� <br />12 <br />Compacted Aggregate, No. 53 <br />0 <br />TON <br />0.00 0.00 <br />13 <br />e <br />HMA Surface, Type B <br />30 <br />TON <br />�.—_._.........._. . .......................... <br />168.00 5,040.00 <br />14 <br />............................................... �.... .............................................. <br />HMA Patching, Type B, Undistributed <br />13 <br />TON <br />698.50 9,686.50 <br />15 <br />Standard Curb, Concrete <br />400................................LFT__..._ <br />.................. <br />26.50 10,600.00 <br />16 <br />Erosion Control Blanket <br />225 <br />SYS <br />. ...._____....... ______________ <br />3.00 675.00 <br />17 <br />WHydro-mulch Seeding, Mix <br />225 <br />SYS <br />18.50...... _mITmm 4,162.50mmmmmmmmm <br />DIVISION <br />A TOTAL <br />$ 92.017.00 <br />Bidder (Firm): RIETH RILEY CONSTRUCTION CO. INC. <br />Address: 2 2d)!SR 23.................... �........� ....._ <br />City/State/Zip: S0t, 1"H.RLNQ IN ,( O.L4.._Telephone Number: 574 288-8321 <br />: By <br />(Signature) <br />(Printed Name of Person Signing) <br />Version 7/20/2018 Contractor's Bid for Public Works - 7 <br />