Laserfiche WebLink
Work <br />Item N( <br />Project Name: Main& Colfax PaEk!�Skruciure Repairs nlI <br />Project Number: 115-143a <br />Date: IlDecernber 11, 2018 <br />Estimated <br />RAM Construction Services <br />of MI <br />Unit Price Bid Price I Unit Price Bid Price <br />la <br />Contractor Mobilization <br />LS <br />1 <br />NIA <br />$ 30,00000 <br />N/A <br />$ 96,50000 <br />2a <br />Contractor General Requirements <br />LS <br />1 <br />N/A <br />$ 6,00000 <br />N/A <br />$ 96,50000 <br />3a <br />Slab -on -Grade Repair <br />SF <br />300 <br />$ 30,00 <br />$ 9,00000 <br />$ 2600 <br />$ 7,800,00 <br />4a <br />Floor Spall Repair <br />SF <br />400 <br />$ 40,00 <br />$ 16,00000 <br />$ 3400 <br />$ 13,60000 <br />5a <br />Full Depth Slab Repair <br />SF <br />2,600 <br />$ 90,00 <br />$ 234,00000 <br />$ 71.00 <br />$ 184.600,00 <br />Sa <br />Ceiling Repair <br />SF <br />2,200 <br />$ 6000 <br />$ 132,000,00 <br />$ 72,00 <br />$ 158,400,00 <br />7a <br />Wall Repair <br />SF <br />200 <br />$ 5000 <br />$ 10,00000 <br />$ 79.00 <br />$ 15,800.00 <br />8a <br />Exterior Wall Repair <br />SF <br />100 <br />$ 100,00 <br />$ 10,00000 <br />$ 12200 <br />$ 12,200.00 <br />9a <br />Beam Repair <br />SF <br />80 <br />$ 300.00 <br />$ 24,000.00 <br />$ 94,00 <br />$ 7.52000 <br />10a <br />Curb Repair <br />SF <br />50 <br />$ 60.00 <br />$ 3,00000 <br />$ 48,00 <br />$ 2.400,00 <br />11a <br />Stair Tread Repair <br />SF <br />200 <br />$ 90,00 <br />$ 18.000,00 <br />$ 9000 <br />$ 18.00000 <br />12a <br />Stair Landing Repair <br />LF <br />100 <br />$ 5000 <br />$ 5,00000 <br />$ 42.00 <br />$ 4,20000 <br />13a <br />Stair Ceiling Repair <br />SF <br />50 <br />$ 200.00 <br />$ 10,000,00 <br />$ 9400 <br />$ 4.70000 <br />14a <br />Temperature PostTensioning Repair - Type 1 <br />EA <br />10 <br />$ 1.10000 <br />$ 11.00000 <br />$ 2,44800 <br />$ 24,48000 <br />15a <br />Temperature PostTensioning Repair - Type 2 <br />EA <br />10 <br />$ 1,100,00 <br />$ 11,00000 <br />$ 2,00000 <br />$ 20,00000 <br />16a <br />Remove & Replace Control Joint Sealants <br />LF <br />350 <br />$ 6,00 <br />$ 2,100,00 <br />$ 5,00 <br />$ 1,750,00 <br />17a <br />Remove and Replace Cove Joint Sealant <br />LF <br />700 <br />$ 6,00 <br />$ 4,200,00 <br />$ 5,00 <br />$ 3.50000 <br />18a <br />Coating @ Exterior Walls <br />SF <br />200 <br />$ 2000 <br />$ 4,00000 <br />$ 840 <br />$ 1,68000 <br />19a <br />Repair Storm Drain System <br />Aflowance <br />1 <br />N/A <br />$ 3,000.00 <br />N/A <br />$ 3.00000 <br />20a <br />Clean & Flush Floor Drain System <br />LS <br />1 <br />N/A <br />$ 100,000,00 <br />N/A <br />$ 6.50000 <br />21a <br />Install Dehumidifier <br />EA <br />2 <br />$ 6.000,00 <br />$ 12.000.00 <br />$ 4,600 00 <br />$ 9,200,00 <br />$ 654.30000 <br />$ 692,33000 <br />Base Bid Part I Total <br />1 b <br />Contractor Mobilization <br />LS <br />1 <br />N/A <br />$ 20,00000 <br />N/A <br />$ 10,00000 <br />2b <br />Contractor General Requirements <br />LS <br />1 <br />N/A <br />$ 7.000.00 <br />N/A <br />$ 10,000.00 <br />3b <br />Center Curb, Concrete Remove <br />SYS <br />27 <br />$ 200.00 <br />$ 5,40000 <br />S 14600 <br />$ 3.94200 <br />4b <br />Sidewalk Concrete, Remove <br />SYS <br />9 <br />$ 300,00 <br />$ 2,70000 <br />S 12600 <br />$ 1,13400 <br />5b <br />Trench Drain, Remove <br />LF <br />31 <br />$ 50,00 <br />$ 1,55000 <br />S 16400 <br />$ 5,08400 <br />6b <br />Smooth Surface at Sidewalk Removal <br />SYS <br />25 <br />$ 20000 <br />$ 5.000,00 <br />S 14500 <br />$ 3.62500 <br />7b <br />Sidewalk Concrete <br />SYS <br />9 <br />$ 300,00 <br />$ 2.70000 <br />S 201,00 <br />$ 1,80900 <br />8b <br />Curb Island, Concrete 6 Inch <br />SYS <br />24 <br />$ 300,00 <br />$ 7,20000 <br />$ 29900 <br />$ 7,176,00 <br />9b <br />Clean and Paint <br />LS <br />1 <br />$ 7.000,00 <br />$ 7,000,00 <br />N/A <br />$ 3,62300 <br />10b <br />Pipe, Storm, Circular, 8 Inch <br />LF <br />5 <br />$ 1 0000 <br />$ 500,00 <br />$ 4,200,00 <br />$ 21,000,00 <br />11b <br />Trench Drain, Retrofit <br />LF <br />37 <br />$ 100.00 <br />$ 3. 70000 <br />S 765,00 <br />$ 28,30500 <br />12b <br />Inlet, Type R with Casting <br />EA <br />1 <br />$ 20000 <br />$ 200.00 <br />$ 3,40000 <br />$ 3,40000 <br />13b <br />Bullard, Relocate <br />EA <br />12 <br />$ 200,00 <br />$ 2,400.00 <br />S 626,00 <br />$ 7,512,00 <br />14b <br />Sign, Sheet, Remove <br />EA <br />24 <br />$ 10000 <br />$ 2.40000 <br />S 13600 <br />$ 3.26400 <br />15b <br />Sign, Sheet, Relocate <br />EA <br />83 <br />$ 200,00 <br />$ 16,600,00 <br />S 25300 <br />$ 20,999,00 <br />16b <br />Sign, Sheet, with Legend, 0,080 Inch <br />SF <br />36 <br />$ 100,00 <br />$ 3,600,00 <br />$ 323,00 <br />$ 11,628,00 <br />17b <br />Parking Exit Equipment, Remove &Salvage <br />EA <br />1 <br />$ 5,00000 <br />$ 5.000.00 <br />11. <br />S 200,00 <br />$ 11,20000 <br />18b <br />Parking Exit Equipment, Relocate <br />EA <br />1 <br />$ 15,000,00 <br />$ 15.000.00 <br />$ 11,625,00 <br />$ 11,62500 <br />19b <br />Parking Entry Equipment, Relocate <br />EA <br />1 <br />$ 15,000.00 <br />$ 15,000,00 <br />$ 11,625,00 <br />$ 11,62500 <br />20b <br />Illuminated Sign <br />EA <br />4 <br />$ 2,00000 <br />$ 8,00000 <br />$ 7,10000 <br />$ 28,40000 <br />21b <br />Pavement Message Marking, Remove <br />SYS <br />29 <br />$ 10000 <br />$ 2,90000 <br />S 6200 <br />$ 1,798,00 <br />22b <br />Line, Paint, Yellow, 8 Inch <br />LF <br />180 <br />$ 2,00 <br />$ 36000 <br />$ 5,45 <br />$ 981,00 <br />23b <br />Line, Paint, Yellow, 4 Inch <br />LF <br />21,320 <br />$ 050 <br />$ 10,660-00 <br />$ 030 <br />$ 6,396.00 <br />24b <br />Line, Remove <br />LF <br />21,500 <br />$ 200 <br />$ 43,000,00 <br />S 060 <br />$ 12,900.00 <br />25b <br />Pavement Marking, Paint, Handicap Symbol <br />EA <br />8 <br />$ 100.00 <br />$ 80000 <br />$ 29300 <br />$ 2.34400 <br />26b <br />Bollard <br />EA <br />2 <br />$ 70000 <br />$ 1,400,00 <br />S 93900 <br />$ 1,878,00 <br />$ 190,07OA0I <br />Base Old Part 2 Total <br />1,64B 00 <br />1base Bid Totals <br />$8",370,00 <br />$923,978.00 J <br />Aftemates <br />No 1 <br />Remove & Replace Doors and Frames <br />LS <br />1 <br />N/A <br />$ 6,00000 <br />N/A <br />$ 10,300,00 <br />No 2 <br />Install Electric Healers <br />EA <br />4 <br />$ <br />4,000,00 $ 16,000,00 <br />$ <br />4,80000 $ 19,20000 <br />No, 3 <br />Remove Ceiling Coating <br />SF <br />100,000 <br />$ <br />3.00 $ 300,000.00 <br />S <br />1.68 $ 168,00000 1 <br />No, 4 <br />Prep & Paint Ceiling Over Existing Coating <br />SF <br />100,000 <br />$ <br />2,00 $ 200,000.00 <br />$ <br />208 $ 208,00000 <br />No. 5 <br />Top of Slab Repair - Partial <br />SF <br />500 <br />$ <br />4000 $ 20,000,00 <br />$ <br />34,00 $ 17,000.00 <br />No, 6 <br />Top of Slab Repair - Full Depth <br />SF <br />500 <br />$ <br />9000 S 4!000'00 <br />$ <br />71 00 $ 35,500,00 <br />Alternates Total <br />$ 587,000 :D:O� <br />� <br />rase <br />4 emaes 0 as <br />Note: D C Byers Co./Detroit Inc corrected Base Bid Part 1 Total to $654,300 00, Base Bid Totals to $844,370,00 and Base Bid + Alternates to <br />$1,341,370 00 by Roger T. Nawrol, City of South Bend Assistant City Engineer <br />I hereby owfil.t the bids are correct as shown: <br />Rogerr P <br />City of South Bend Assistant City Engineer <br />December 17, 2018 <br />