Laserfiche WebLink
3. Basin Interconnection <br />Background: <br />It has been identified that connecting the basins that serve CS003 and CS006 could benefit from <br />sharing flows during certain storm events. Interconnection would be a first time this type of work <br />has been done to alleviate flows and further the effectiveness of the real time control system. An <br />evaluation needs to be performed to understand the extent of the work required to perform such <br />an interconnection. <br />Objective: <br />Identify and scope out work that would be required to interconnect two hydraulically separate <br />basins. <br />Tasks: <br />A. Map out multiple routes to interconnect the CS006 and CS003 basins <br />B. Obtain and review existing sewer, water, electrical, and gas infrastructure maps to <br />identify possible construction conflicts <br />C. Hold contractor meeting to verify and scrutinize work performed in Task B. <br />Deliverables: <br />Technical memorandum that: <br />1. Describes the optimum route to hydraulically interconnect CS003 and CS006 <br />2. Lists potential conflicts with existing buried infrastructure along that route <br />3. Recommendations as to how to alleviate these conflicts <br />4. Recommended control scheme and control structure considerations <br />emnet 121 S. Niles Ave., Suite 22, South Bend, IN 46617, +1.574.855.1012, www.emnet.net <br />