BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name: Small Drainage Design and Repair
<br />Project Number: 118-063
<br />For Bids Due: December 11, 2018 before 9:30 AM Local Time
<br />ContractorName: G.E. Marshall, Inc.
<br />DIVISION
<br />C, CREEKWATER
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />I
<br />Maintenance of Traffic
<br />1
<br />LS
<br />$2,500.00
<br />$2,500.00
<br />2
<br />Mobilization and Demobilization
<br />1
<br />LS
<br />$14,683.25
<br />. . ....................
<br />$14.683.25
<br />------------
<br />Pavement Removal
<br />62
<br />SYS
<br />$32.46
<br />$2,012.52
<br />. . . .........
<br />HMA, Surface, 1.5 inches
<br />........ ...
<br />5
<br />T
<br />$1,008,00
<br />$5, 40.00
<br />5
<br />HMA, Base, 6.5 inches
<br />22
<br />T
<br />$465.82
<br />$10,248.04
<br />6
<br />..........................................
<br />Remove/Replace Curb and Gutter, Roll
<br />36
<br />LFT
<br />....................... ....................... . . . .. .
<br />$112.55
<br />$4,051.80
<br />Curb
<br />7
<br />Core7 Connection for 12" Dia, Pipe to
<br />1
<br />EA
<br />9tFJJGtWe
<br />$830-00 �$830.00
<br />8
<br />Pipe, 12" RCP . . ................ .
<br />:�950
<br />LFT
<br />$192-43
<br />$ - 9 621.50
<br />9
<br />l�'�pe, 12" Ductfle lron
<br />28
<br />FT
<br />$121.1a,
<br />-11.39-3.A-4.
<br />10
<br />Manhcile,, Standard
<br />1
<br />$6,419.35
<br />$6,419-35
<br />............ ... . . ..........
<br />11
<br />Drvwell, 6' Dia., 3 sections
<br />2
<br />EA
<br />$12,566.75
<br />$25,133-50
<br />12
<br />'[Wility
<br />Reset Sign and Post
<br />1
<br />EA
<br />$200.00
<br />$200.00
<br />13
<br />Allowance.,
<br />1
<br />............
<br />LS
<br />10g,000-00
<br />I
<br />"1 $100,000.00
<br />CREEK
<br />WATER
<br />DIVISION
<br />C TOTAL
<br />$94,133.00
<br />ALTERNATE
<br />#C1 (STREET MILLIFILL & CURB
<br />RAMPS)
<br />—
<br />-
<br />. ... ...
<br />.... . . . ............
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />7Total Am o unt
<br />14
<br />Mobilization and Demobilization
<br />1
<br />LS
<br />$5,664.66�$5,664.66
<br />15
<br />Remove/Replace Curb and Gutter, Roll
<br />14
<br />LFT
<br />$120.85
<br />. .. ...............
<br />1,691.90
<br />Curb, Depressed
<br />.. .............. . ....... .......
<br />—
<br />16
<br />Remove/Replace Concrete Sidewalk &
<br />22
<br />SyS
<br />$206-06
<br />$4,533.32
<br />Curb Ramp
<br />. . . ...... . . .
<br />17
<br />Milling, Asphalt, 1.5 to 2.5 inches
<br />268
<br />SYS
<br />$27.59
<br />. .......
<br />$7,394.12
<br />8
<br />. .........................................
<br />HMA, Surface, 1.5 to 2.5 inches
<br />—e - — . . . . . . .. . . . ....
<br />330
<br />.. ...................
<br />T
<br />-
<br />$228.00
<br />11$6,840.00
<br />19
<br />[-6--tility A'"'I'l o"w" a—n c
<br />1
<br />LS
<br />$65,000.00
<br />$66,000.00
<br />ALTERNATE
<br />#C1 TOTAL
<br />$32,124.00
<br />Version 7/20/2018 Contractor's Bid for Public Works - 10
<br />
|