Laserfiche WebLink
1316 Couwy-Cary BUILDING <br />227 W.JEFFERSON BOULEVARD <br />SOU"rB BEND, INDIANA 46601-1 S30 <br />PHONE 574/235-9251 <br />FAx 574/235-9171 <br />TDD 574/ 235-5567 <br />CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR <br />BOARD OF PUBLIC WORKS <br />McKinley Avenue and Fremont Park Improvements <br />118-072 <br />Addendum No. 2 <br />Date: December 7, 2018 <br />To: All Planholders <br />From: Sue Ellen Doudrick, Project Manager <br />The items in this addendum are to become a part of the original documents as if included therein. Only <br />the noted items are affected, and the remainder of the original contract document is to remain in its <br />entirety. <br />This Addendum modifies the Contract Documents as follows: <br />PART 1 — BID TAB CLARIFICATIONS <br />PART 2 —CONSTRUCTION DOCUMENTS <br />PART 1 - CLARIFICATIONS <br />1.01 Contractor Bid Tab Form <br />1. REPLACE sheet with attached revised Bid Tab sheets. Changes have been highlighted. <br />PART 2 — <br />CONSTRUCTION DOCUMENTS <br />2.01 SHEET 03, PLAN AND PROFILE McKINLEY AVE Sta 9+00 to 15+00: <br />1. REPLACE sheet with attached plan sheet. Revisions to callouts include the removal of rip <br />rap on side slope and clarification of construction around existing manholes. <br />2.02 SHEET 04, MCKINLEY AVE CONSTRUCTION DETAILS: <br />1. REPLACE sheet with attached plan sheet. Revisions to details includes the addition of slope <br />information to curb detail, and the inclusion of the City of South Bend Standard Catch Basin <br />Detail (replaces Storm Inlet) and the Standard Saddle Structure Detail (replaces Standard <br />Manhole). <br />2.03 SHEET 07, PLAN AND PROFILE FREMONT ST Sta 20+00 to 24+00: <br />1. REPLACE sheet with attached plan sheet. Revisions to plan includes the relocation of the <br />drywells 2.4' further back of curb location and the lid opening location, and the size of the <br />pipe between the catch basin and the drywell. <br />2.04 SHEET 08, PLAN AND PROFILE FREMONT ST Sta 24+00 to 27+50: <br />1. REPLACE sheet with attached plan sheet. Revisions to plan includes the relocation of the <br />drywells 2.4' further back of curb location and the lid opening location, and the size of the <br />pipe between the catch basin and the drywell. <br />2.05 SHEET 09, PLAN AND PROFILE MARQUETTE BLVD Sta 30+00 to 33+00 <br />